Question
90 men can complete a work in 24 days working 8 hours a day. How many men are required to complete the same work in 18 days working `7 1/2` hours a day?
Advertisements
Solution
In 24 days, working 8 hours a day, work can be completed by = 90 men
In 1 day, working 8 hours a day, work can be completed by = 90 × 24 men
In 18 days, working 8 hours a day, work can be completed by =`(90xx24)/18` men
In 18 days, working 1 hour a day, work can be completed by = `(90xx24)/18xx8` men
In 18 days, working `7 1/2` i.e. `15/2` hours a day, work can be completed by =`(90xx24xx8)/18xx2/15` men
`=(90xx24xx8xx2)/(18xx15)=(1xx24xx8xx2)/3` = 128 men
APPEARS IN
RELATED QUESTIONS
If 56 workers can build a wall in 180 hours, how many workers will be required to do the same work in 70 hours?
A car takes 6 hours to reach a destination by travelling at a speed of 50 km per hour. How long will it take when the car travels at a speed of 75 km per hour?
Cost of 24 identical articles is Rs. 108, Find the cost of 40 similar articles.
In order to complete a work in 28 days, 60 men are required. How many men will be required if the same work is to be completed in 40 days?
If 12 men or 18 women can complete a piece of work in 7 days, in how many days can 4 men and 8 women complete the same work?
A, B, and C can do a piece of work in 6 days, 12 days, and 24 days respectively. In what time will they altogether do it?
A can do a piece of work in 10 days; B in 18 days; and A, B, and C together in 4 days. In what time would C alone do it?
A can-do `1/4` of work in 5 days and B can do `1/3` of the same work in 10 days. Find the number of days in which both working together will complete the work.
Two pipes P and Q would fill an empty cistern in 24 minutes and 32 minutes respectively. Both the pipes being opened together, find when the first pipe must be turned off so that the empty cistern maybe just filled in 16 minutes.
P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?