English
Tamil Nadu Board of Secondary EducationSSLC (English Medium) Class 8

X alone can do a piece of work in 6 days and Y alone in 8 days. X and Y undertook the work for ₹ 48000. With the help of Z, they completed the work in 3 days. How much is Z’s share?

Advertisements
Advertisements

Question

X alone can do a piece of work in 6 days and Y alone in 8 days. X and Y undertook the work for ₹ 48000. With the help of Z, they completed the work in 3 days. How much is Z’s share?

Sum
Advertisements

Solution

X can do the work in 6 days.

X’s 1 day work = `1/6`

X’s share for 1 day = `1/6 xx 48000` = ₹ 8000

X’s share for 3 days = 3 × 8000 = ₹ 24000

Y can complete the work in 8 days.

Y’s 1 day work = `1/8`

Y’s 1 day share = `1/8 xx 48000` = ₹ 6000

Y’s 3 days share = ₹ 6000 × 3 = ₹ 18000

(X + Y)’s 3 days share = ₹ 24000 + ₹ 18000 = ₹ 42000

Remaining money is Z’s share

∴ Z’s share = ₹ 48000 – ₹ 42000 = ₹ 6000

shaalaa.com
Time and Work
  Is there an error in this question or solution?
Chapter 4: Life Mathematics - Exercise 4.5 [Page 152]

APPEARS IN

Samacheer Kalvi Mathematics [English] Class 8 TN Board
Chapter 4 Life Mathematics
Exercise 4.5 | Q 15 | Page 152

RELATED QUESTIONS

22 men can dig a 27 m long trench in one day. How many men should be employed for digging 135 m long trench of the same type in one day?


Cost of 24 identical articles is Rs. 108, Find the cost of 40 similar articles.


In order to complete a work in 28 days, 60 men are required. How many men will be required if the same work is to be completed in 40 days?


If 3 men or 6 boys can finish a work in 20 days, how long will 4 men and 12 boys take to finish the same work?


A, B, and C can do a piece of work in 6 days, 12 days, and 24 days respectively. In what time will they altogether do it?


A can do a piece of work in 24 days, A and B can do it in 16 days and A, B, and C in `10 2/3`  days. In how many days can A and C do it working together?


A can do a piece of work in 20 days and B in 15 days. They worked together on it for 6 days and then A left. How long will B take to finish the remaining work?


A and B complete a piece of work in 24 days. B and C do the same work in 36 days; and A, B, and C together finish it in 18 days. In how many days will:
(i) A alone,
(ii) C alone,
(iii) A and C together, complete the work?


A and B can do a piece of work in 40 days; B and C in 30 days; and C and A in 24 days.

  1. How long will it take them to do the work together?
  2. In what time can each finish it working alone?

P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?