मराठी
तामिळनाडू बोर्ड ऑफ सेकेंडरी एज्युकेशनएस.एस.एल.सी. (इंग्रजी माध्यम) इयत्ता ८

X alone can do a piece of work in 6 days and Y alone in 8 days. X and Y undertook the work for ₹ 48000. With the help of Z, they completed the work in 3 days. How much is Z’s share? - Mathematics

Advertisements
Advertisements

प्रश्न

X alone can do a piece of work in 6 days and Y alone in 8 days. X and Y undertook the work for ₹ 48000. With the help of Z, they completed the work in 3 days. How much is Z’s share?

बेरीज
Advertisements

उत्तर

X can do the work in 6 days.

X’s 1 day work = `1/6`

X’s share for 1 day = `1/6 xx 48000` = ₹ 8000

X’s share for 3 days = 3 × 8000 = ₹ 24000

Y can complete the work in 8 days.

Y’s 1 day work = `1/8`

Y’s 1 day share = `1/8 xx 48000` = ₹ 6000

Y’s 3 days share = ₹ 6000 × 3 = ₹ 18000

(X + Y)’s 3 days share = ₹ 24000 + ₹ 18000 = ₹ 42000

Remaining money is Z’s share

∴ Z’s share = ₹ 48000 – ₹ 42000 = ₹ 6000

shaalaa.com
Time and Work
  या प्रश्नात किंवा उत्तरात काही त्रुटी आहे का?
पाठ 4: Life Mathematics - Exercise 4.5 [पृष्ठ १५२]

APPEARS IN

सामाचीर कलवी Mathematics [English] Class 8 TN Board
पाठ 4 Life Mathematics
Exercise 4.5 | Q 15 | पृष्ठ १५२

संबंधित प्रश्‍न

A train is moving with a uniform speed of 120 km per hour.
(i) How far will it travel in 36 minutes?
(ii) In how much time will it cover 210 km?


In a fort 150 men had provisions for 45 days. After 10 days, 25 men left the fort. How long would the food last at the same rate?


Cost of 24 identical articles is Rs. 108, Find the cost of 40 similar articles.


In order to complete a work in 28 days, 60 men are required. How many men will be required if the same work is to be completed in 40 days?


Twelve typists, all working with the same speed, type a certain number of pages in 18 days working 8 hours a day. Find, how many hours per day must sixteen typists work in order to type the same number of pages in 9 days?


A can do a piece of work in 10 days; B in 18 days; and A, B, and C together in 4 days. In what time would C alone do it?


A can-do `1/4` of work in 5 days and B can do `1/3` of the same work in 10 days. Find the number of days in which both working together will complete the work.


A and B can do a work in 8 days; B and C in 12 days, and A and C in 16 days. In what time could they do it, all working together?


Two pipes P and Q would fill an empty cistern in 24 minutes and 32 minutes respectively. Both the pipes being opened together, find when the first pipe must be turned off so that the empty cistern maybe just filled in 16 minutes.


P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×