प्रश्न
X alone can do a piece of work in 6 days and Y alone in 8 days. X and Y undertook the work for ₹ 48000. With the help of Z, they completed the work in 3 days. How much is Z’s share?
Advertisements
उत्तर
X can do the work in 6 days.
X’s 1 day work = `1/6`
X’s share for 1 day = `1/6 xx 48000` = ₹ 8000
X’s share for 3 days = 3 × 8000 = ₹ 24000
Y can complete the work in 8 days.
Y’s 1 day work = `1/8`
Y’s 1 day share = `1/8 xx 48000` = ₹ 6000
Y’s 3 days share = ₹ 6000 × 3 = ₹ 18000
(X + Y)’s 3 days share = ₹ 24000 + ₹ 18000 = ₹ 42000
Remaining money is Z’s share
∴ Z’s share = ₹ 48000 – ₹ 42000 = ₹ 6000
APPEARS IN
संबंधित प्रश्न
22 men can dig a 27 m long trench in one day. How many men should be employed for digging 135 m long trench of the same type in one day?
72 men do a piece of work in 25 days. In how many days will 30 men do the same work?
Cost of 24 identical articles is Rs. 108, Find the cost of 40 similar articles.
A can do a piece of work in 10 days and B in 15 days. How long will they take together to finish it?
A and B together can do a piece of work in `6 2/3` days, but B alone can do it in 10 days. How long will A take to do it alone?
A and B working together can mow a field in 56 days and with the help of C, they could have mowed it in 42 days. How long would C take by himself?
A can do a piece of work in 20 days and B in 15 days. They worked together on it for 6 days and then A left. How long will B take to finish the remaining work?
A can finish a piece of work in 15 days and B can do it in 10 days. They worked together for 2 days and then B goes away. In how many days will A finish the remaining work?
A and B can do a work in 8 days; B and C in 12 days, and A and C in 16 days. In what time could they do it, all working together?
P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?