Advertisements
Advertisements
प्रश्न
X alone can do a piece of work in 6 days and Y alone in 8 days. X and Y undertook the work for ₹ 48000. With the help of Z, they completed the work in 3 days. How much is Z’s share?
Advertisements
उत्तर
X can do the work in 6 days.
X’s 1 day work = `1/6`
X’s share for 1 day = `1/6 xx 48000` = ₹ 8000
X’s share for 3 days = 3 × 8000 = ₹ 24000
Y can complete the work in 8 days.
Y’s 1 day work = `1/8`
Y’s 1 day share = `1/8 xx 48000` = ₹ 6000
Y’s 3 days share = ₹ 6000 × 3 = ₹ 18000
(X + Y)’s 3 days share = ₹ 24000 + ₹ 18000 = ₹ 42000
Remaining money is Z’s share
∴ Z’s share = ₹ 48000 – ₹ 42000 = ₹ 6000
APPEARS IN
संबंधित प्रश्न
22 men can dig a 27 m long trench in one day. How many men should be employed for digging 135 m long trench of the same type in one day?
A train is moving with a uniform speed of 120 km per hour.
(i) How far will it travel in 36 minutes?
(ii) In how much time will it cover 210 km?
36 men can do a piece of work in 7 days. How many men will do the same work in 42 days?
72 men do a piece of work in 25 days. In how many days will 30 men do the same work?
A can do a work in 15 days and B in 20 days. If they together work on it for 4 days; what fraction of the work will be left?
A can do a piece of work in 24 days, A and B can do it in 16 days and A, B, and C in `10 2/3` days. In how many days can A and C do it working together?
A can-do `1/4` of work in 5 days and B can do `1/3` of the same work in 10 days. Find the number of days in which both working together will complete the work.
A and B can do a work in 8 days; B and C in 12 days, and A and C in 16 days. In what time could they do it, all working together?
A and B can do a piece of work in 40 days; B and C in 30 days; and C and A in 24 days.
- How long will it take them to do the work together?
- In what time can each finish it working alone?
A can do a piece of work in 10 days, B in 12 days, and C in 15 days. All begin together but A leaves the work after 2 days and B leaves 3 days before the work is finished. How long did the work last?
