P alone can do `1/2` of a work in 6 days and Q alone can do `2/3` of the same work in 4 days. in how many days will they finish `3/4` of the work, working together?

योग
Advertisements

उत्तर

`1/2` of the work is done by P in 6 days

∴ Full work is done by P in `6/(1/2)` = 6 × 2 = 12 days

`2/3` of work done by Q in 4 days.

∴ Full work is done by Q in `4/(2/3) = 4 xx 3/2` = 6 days

(P + Q) will finish the whole work in `"ab"/("a" + "b")` days

= `(12 xx 6)/(12 + 6)`

= `(12 xx 6)/18`

= 4 days

(P + Q) will finish `(-3)/4` of the work in `4 xx 3/4` = 3 days.

shaalaa.com
Time and Work
  क्या इस प्रश्न या उत्तर में कोई त्रुटि है?
अध्याय 4: Life Mathematics - Exercise 4.5 [पृष्ठ १५२]

APPEARS IN

सामाचीर कलवी Mathematics [English] Class 8 TN Board
अध्याय 4 Life Mathematics
Exercise 4.5 | Q 14 | पृष्ठ १५२

संबंधित प्रश्न

A train is moving with a uniform speed of 120 km per hour.
(i) How far will it travel in 36 minutes?
(ii) In how much time will it cover 210 km?


36 men can do a piece of work in 7 days. How many men will do the same work in 42 days?


If 56 workers can build a wall in 180 hours, how many workers will be required to do the same work in 70 hours?


A car takes 6 hours to reach a destination by travelling at a speed of 50 km per hour. How long will it take when the car travels at a speed of 75 km per hour?


In order to complete a work in 28 days, 60 men are required. How many men will be required if the same work is to be completed in 40 days?


A can do a work in 15 days and B in 20 days. If they together work on it for 4 days; what fraction of the work will be left?


A and B working together can mow a field in 56 days and with the help of C, they could have mowed it in 42 days. How long would C take by himself?


A and B can do a piece of work in 40 days; B and C in 30 days; and C and A in 24 days.

  1. How long will it take them to do the work together?
  2. In what time can each finish it working alone?

A can do a piece of work in 10 days, B in 12 days, and C in 15 days. All begin together but A leaves the work after 2 days and B leaves 3 days before the work is finished. How long did the work last?


P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×