Question

In a fort 150 men had provisions for 45 days. After 10 days, 25 men left the fort. How long would the food last at the same rate?

Sum
Advertisements

Solution 1

After 10 days:

For 150 men, provision will last (45 − 10)

days = 35 days

⇒ For 1 man, the provisions will last

= 150 × 35 days

And for (150 − 25) = 125 men, the provisions

will last for =`(150xx35)/125`

= 42 days

shaalaa.com

Solution 2

Given: 

  1. 150 men have food for 45 days.
  2. After 10 days, 25 men leave the fort.
  3. We need to find how long the remaining food will last for 125 men.

The total amount of food is:

Total food = 150⋅45 = 6750 man-days.

Food consumed by 150 men in 10 days is

Food consumed = 150⋅10 = 1500 man-days.

The remaining food after 10 days is

Remaining food = 6750 − 1500 = 5250 man-days.

After 25 men leave, the remaining men are:

Remaining men = 150 − 25 = 125.

The number of days the remaining food will last for 125 men is:

Remaining days = `"Remaining food"/"Remaining men"=5250/125`

= 42 days

shaalaa.com
Time and Work
  Is there an error in this question or solution?
Chapter 10: Direct and Inverse Variations - Exercise 10 (B) [Page 123]

APPEARS IN

Selina Concise Mathematics [English] Class 8 ICSE
Chapter 10 Direct and Inverse Variations
Exercise 10 (B) | Q 5 | Page 123

RELATED QUESTIONS

A train is moving with a uniform speed of 120 km per hour.
(i) How far will it travel in 36 minutes?
(ii) In how much time will it cover 210 km?


12 pipes, all of the same size, fill a tank in 42 minutes. How long will it take to fill the same tank, if 21 pipes of the same size are used?


In order to complete a work in 28 days, 60 men are required. How many men will be required if the same work is to be completed in 40 days?


If 12 men or 18 women can complete a piece of work in 7 days, in how many days can 4 men and 8 women complete the same work?


A can do a piece of work in 20 days and B in 15 days. They worked together on it for 6 days and then A left. How long will B take to finish the remaining work?


A can-do `1/4` of work in 5 days and B can do `1/3` of the same work in 10 days. Find the number of days in which both working together will complete the work.


A and B can do a work in 8 days; B and C in 12 days, and A and C in 16 days. In what time could they do it, all working together?


A and B can do a piece of work in 40 days; B and C in 30 days; and C and A in 24 days.

  1. How long will it take them to do the work together?
  2. In what time can each finish it working alone?

A can do a piece of work in 10 days, B in 12 days, and C in 15 days. All begin together but A leaves the work after 2 days and B leaves 3 days before the work is finished. How long did the work last?


P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×