प्रश्न
In a fort 150 men had provisions for 45 days. After 10 days, 25 men left the fort. How long would the food last at the same rate?
Advertisements
उत्तर १
After 10 days:
For 150 men, provision will last (45 − 10)
days = 35 days
⇒ For 1 man, the provisions will last
= 150 × 35 days
And for (150 − 25) = 125 men, the provisions
will last for =`(150xx35)/125`
= 42 days
उत्तर २
Given:
- 150 men have food for 45 days.
- After 10 days, 25 men leave the fort.
- We need to find how long the remaining food will last for 125 men.
The total amount of food is:
Total food = 150⋅45 = 6750 man-days.
Food consumed by 150 men in 10 days is
Food consumed = 150⋅10 = 1500 man-days.
The remaining food after 10 days is
Remaining food = 6750 − 1500 = 5250 man-days.
After 25 men leave, the remaining men are:
Remaining men = 150 − 25 = 125.
The number of days the remaining food will last for 125 men is:
Remaining days = `"Remaining food"/"Remaining men"=5250/125`
= 42 days
APPEARS IN
संबंधित प्रश्न
22 men can dig a 27 m long trench in one day. How many men should be employed for digging 135 m long trench of the same type in one day?
If 15 men can complete a piece of work in 30 days, in how many days will 18 men complete it?
A garrison has sufficient provisions for 480 men for 12 days. If the number of men is reduced by 160; find how long will the provisions last?
If 12 men or 18 women can complete a piece of work in 7 days, in how many days can 4 men and 8 women complete the same work?
Twelve typists, all working with the same speed, type a certain number of pages in 18 days working 8 hours a day. Find, how many hours per day must sixteen typists work in order to type the same number of pages in 9 days?
A can do a piece of work in 10 days and B in 15 days. How long will they take together to finish it?
A, B, and C can do a piece of work in 6 days, 12 days, and 24 days respectively. In what time will they altogether do it?
A can do a piece of work in 20 days and B in 15 days. They worked together on it for 6 days and then A left. How long will B take to finish the remaining work?
A can do a piece of work in 10 days, B in 12 days, and C in 15 days. All begin together but A leaves the work after 2 days and B leaves 3 days before the work is finished. How long did the work last?
P alone can do `1/2` of a work in 6 days and Q alone can do `2/3` of the same work in 4 days. in how many days will they finish `3/4` of the work, working together?