Advertisements
Advertisements
प्रश्न
In a fort 150 men had provisions for 45 days. After 10 days, 25 men left the fort. How long would the food last at the same rate?
Advertisements
उत्तर १
After 10 days:
For 150 men, provision will last (45 − 10)
days = 35 days
⇒ For 1 man, the provisions will last
= 150 × 35 days
And for (150 − 25) = 125 men, the provisions
will last for =`(150xx35)/125`
= 42 days
उत्तर २
Given:
- 150 men have food for 45 days.
- After 10 days, 25 men leave the fort.
- We need to find how long the remaining food will last for 125 men.
The total amount of food is:
Total food = 150⋅45 = 6750 man-days.
Food consumed by 150 men in 10 days is
Food consumed = 150⋅10 = 1500 man-days.
The remaining food after 10 days is
Remaining food = 6750 − 1500 = 5250 man-days.
After 25 men leave, the remaining men are:
Remaining men = 150 − 25 = 125.
The number of days the remaining food will last for 125 men is:
Remaining days = `"Remaining food"/"Remaining men"=5250/125`
= 42 days
APPEARS IN
संबंधित प्रश्न
12 pipes, all of the same size, fill a tank in 42 minutes. How long will it take to fill the same tank, if 21 pipes of the same size are used?
72 men do a piece of work in 25 days. In how many days will 30 men do the same work?
If 56 workers can build a wall in 180 hours, how many workers will be required to do the same work in 70 hours?
A car takes 6 hours to reach a destination by travelling at a speed of 50 km per hour. How long will it take when the car travels at a speed of 75 km per hour?
If 15 men can complete a piece of work in 30 days, in how many days will 18 men complete it?
A can do a piece of work in 10 days and B in 15 days. How long will they take together to finish it?
A can finish a piece of work in 15 days and B can do it in 10 days. They worked together for 2 days and then B goes away. In how many days will A finish the remaining work?
A and B can do a work in 8 days; B and C in 12 days, and A and C in 16 days. In what time could they do it, all working together?
A can do a piece of work in 10 days, B in 12 days, and C in 15 days. All begin together but A leaves the work after 2 days and B leaves 3 days before the work is finished. How long did the work last?
P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?
