Question
It takes 60 days for 10 machines to dig a hole. Assuming that all machines work at the same speed, how long will it take 30 machines to dig the same hole?
Advertisements
Solution
Let the number of days required be x.
| Number of machines | 10 | 30 |
| Number of days | 60 | x |
As the number of machines increases it takes less days to complete the work
∴ They are in inverse proportion, x1y1 = x2y2
10 × 60 = 30 × x
x = `(10 xx 60)/30`, x = 20
It takes 20 days to dig the hole
APPEARS IN
RELATED QUESTIONS
Which of the following are in inverse proportion?
The time taken for a fixed journey and the speed of the vehicle.
A factory required 42 machines to produce a given number of articles in 63 days. How many machines would be required to produce the same number of articles in 54 days?
A school has 8 periods a day each of 45 minutes duration. How long would each period be, if the school has 9 periods a day, assuming the number of school hours to be the same?
In which of the following table x and y vary inversely:
| x | 9 | 24 | 15 | 3 |
| y | 8 | 3 | 4 | 25 |
Which of the following quantities vary inversely as other?
The length x of a journey by bus and price y of the ticket.
If 36 men can do a piece of work in 25 days, in how many days will 15 men do it?
Mohanrao took 10 days to finish a book, reading 40 pages every day. How many pages must be read in a day to finish it in 8 days?
10 farmers can plough a field in 21 days. Find the number of days reduced if 14 farmers ploughed the same field?
Both x and y are said to vary ______ with each other if for some positive number k, xy = k.
Two quantities are said to vary ______ with each other if an increase in one causes a decrease in the other in such a manner that the product of their corresponding values remains constant.