Advertisements
Advertisements
प्रश्न
It takes 60 days for 10 machines to dig a hole. Assuming that all machines work at the same speed, how long will it take 30 machines to dig the same hole?
Advertisements
उत्तर
Let the number of days required be x.
| Number of machines | 10 | 30 |
| Number of days | 60 | x |
As the number of machines increases it takes less days to complete the work
∴ They are in inverse proportion, x1y1 = x2y2
10 × 60 = 30 × x
x = `(10 xx 60)/30`, x = 20
It takes 20 days to dig the hole
APPEARS IN
संबंधित प्रश्न
A farmer has enough food to feed 20 animals in his cattle for 6 days. How long would the food last if there were 10 more animals in his cattle?
A batch of bottles was packed in 25 boxes with 12 bottles in each box. If the same batch is packed using 20 bottles in each box, how many boxes would be filled?

A car takes 2 hours to reach a destination by travelling at the speed of 60 km/h. How long will it take when the car travels at the speed of 80 km/h?
55 cows can graze a field in 16 days. How many cows will graze the same field in 10 days?
Mohanrao took 10 days to finish a book, reading 40 pages every day. How many pages must be read in a day to finish it in 8 days?
The stock of grain in a government warehouse lasts 30 days for 4000 people. How many days will it last for 6000 people?
16 taps can fill a petrol tank in 18 minutes. The time taken for 9 taps to fill the same tank will be _________ minutes
4 typists are employed to complete a work in 12 days. If two more typists are added, they will finish the same work in _________ days
Which quantities in the previous question vary inversely with each other?
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
| a | l | 9 | n | 6 |
| b | 5 | m | 25 | 10 |
