Is Work Done a Scalar Or a Vector Physical Quantity?
Advertisements
Question
Is work done a scalar or a vector physical quantity?
Advertisements
Solution
Work is a scalar quantity because it is a measure of transfer of energy without indicating any direction.
APPEARS IN
RELATED QUESTIONS
Name five appliances or machines which use an electric motor.
What is the work done against gravity when a body is moved horizontally along a frictionless surface?
When you move upstairs, do you perform some work?
An electric motor drives a machine which lifts a mass of 4 kg through a height of 10 m in 5 s at a constant speed. Assuming g = 10 ms-2, calculate
(i) the amount of work done, (ii) the power of the machine.
State the energy changes which take place when A toy car with a wound spring moves on ground.
A body of mass 60 kg has the momentum 3000 kgm/s-1. Calculate: the speed of the body.
If a ball is dropped on the sloping roof of a house, it acquires ______ and falls on the ground. That is the transformation of ______ energy into ______ energy takes place.
(kinetic, potential, motion)
A man squatting on the ground gets straight up and stand. The force of reaction of ground on the man during the process is ______.
