Question
6 men can complete the electric fitting in a building in 7 days. How many days will it take if 21 men do the job?
Advertisements
Solution
\[\text{ It is given that 6 men can complete a job in 7 days } . \]
\[ \therefore \text{ Time taken by 1 man to complete the same job } = \left( 6 \times 7 \right) = 42 \text{ days } \]
\[ \therefore \text{ Time taken by 21 men to complete the same job } = \frac{42}{21} = 2 \text { days } \]
APPEARS IN
RELATED QUESTIONS
68 boxes of a certain commodity require a shelf-length of 13.6 m. How many boxes of the same commodity would occupy a shelf length of 20.4 m?
A and B can polish the floors of a building in 10 days. A alone can do \[\frac{1}{4}\] th of it in 12 days. In how many days can B alone polish the floor ?
If 25 men earn Rs 1000 in 10 days, how much will 15 men earn in 15 days?
The cost of 12 quintals of soyabean is 36,000 rupees. How much will 8 quintals cost?
If the cost of 8 apples is ₹ 56 then the cost of 12 apples is _______
If the cost of 6 cans of juice in ₹ 210, then what will be the cost of 4 cans of juice?
If x and y are in direct proportion, then (x – 1) and (y – 1) are also in direct proportion.
The number of workers and the time to complete a job is a case of direct proportion.
l varies directly as m and l is equal to 5, when `m = 2/3`. Find l when `m = 16/3`.
It is given that l varies directly as m. Write an equation which relates l and m.