प्रश्न
6 men can complete the electric fitting in a building in 7 days. How many days will it take if 21 men do the job?
Advertisements
उत्तर
\[\text{ It is given that 6 men can complete a job in 7 days } . \]
\[ \therefore \text{ Time taken by 1 man to complete the same job } = \left( 6 \times 7 \right) = 42 \text{ days } \]
\[ \therefore \text{ Time taken by 21 men to complete the same job } = \frac{42}{21} = 2 \text { days } \]
संबंधित प्रश्न
The second class railway fare for 240 km of Journey is Rs 15.00. What would be the fare for a journey of 139.2 km?
11 men can dig \[6\frac{3}{4}\] metre long trench in one day. How many men should be employed for digging 27 metre long trench of the same type in one day?
Reema weaves 35 baskets in 25 days. In how many days will she weave 55 baskets?
If 9 girls can prepare 135 garlands in 3 hours, how many girls are needed to prepare 270 garlands in 1 hour?
A dozen bananas costs ₹ 20. What is the price of 48 bananas?
If half a meter of cloth costs ₹ 15. Find the cost of `8 1/3` meters of the same cloth
A truck needs 54 litres of diesel for covering a distance of 297 km. The diesel required by the truck to cover a distance of 550 km is ______.
In direct proportion, `a_1/b_1` ______ `a_2/b_2`
For fixed time period and rate of interest, the simple interest is directly proportional to the principal.
The following table shows the distance travelled by one of the new eco-friendly energy-efficient cars travelled on gas.
| Litres of gas | 1 | 0.5 | 2 | 2.5 | 3 | 5 |
| Distance (km) | 15 | 7.5 | 30 | 37.5 | 45 | 75 |
Which type of properties are indicated by the table? How much distance will be covered by the car in 8 litres of gas?