Advertisements
Advertisements
प्रश्न
6 men can complete the electric fitting in a building in 7 days. How many days will it take if 21 men do the job?
Advertisements
उत्तर
\[\text{ It is given that 6 men can complete a job in 7 days } . \]
\[ \therefore \text{ Time taken by 1 man to complete the same job } = \left( 6 \times 7 \right) = 42 \text{ days } \]
\[ \therefore \text{ Time taken by 21 men to complete the same job } = \frac{42}{21} = 2 \text { days } \]
संबंधित प्रश्न
In Question 2 above, if 1 part of a red pigment requires 75 mL of base, how much red pigment should we mix with 1800 mL of base?
Rashmi has a road map with a scale of 1 cm representing 18 km. She drives on a road for 72 km. What would be her distance covered in the map?
If the cost of 93 m of a certain kind of plastic sheet is Rs 1395, then what would it cost to buy 105 m of such plastic sheet?
In a library 136 copies of a certain book require a shelf-length of 3.4 metre. How many copies of the same book would occupy a shelf-length of 5.1 metres?
A cistern can be filled by one tap in 8 hours, and by another in 4 hours. How long will it take to fill the cistern if both taps are opened together?
A cistern can be filled by a tap in 4 hours and emptied by an outlet pipe in 6 hours. How long will it take to fill the cistern if both the tap and the pipe are opened together?
Two mobiles cost 16,000 rupees. How much money will be required to buy 13 such mobiles?
The number of workers and the time to complete a job is a case of direct proportion.
l varies directly as m and l is equal to 5, when `m = 2/3`. Find l when `m = 16/3`.
Pattern B consists of four tiles like pattern A. Write a proportion involving red dots and blue dots in pattern A and B. Are they in direct proportion? If yes, write the constant of proportion.

