6 men can complete the electric fitting in a building in 7 days. How many days will it take if 21 men do the job?
Advertisements
उत्तर
\[\text{ It is given that 6 men can complete a job in 7 days } . \]
\[ \therefore \text{ Time taken by 1 man to complete the same job } = \left( 6 \times 7 \right) = 42 \text{ days } \]
\[ \therefore \text{ Time taken by 21 men to complete the same job } = \frac{42}{21} = 2 \text { days } \]
APPEARS IN
संबंधित प्रश्न
The amount of extension in an elastic string varies directly as the weight hung on it. If a weight of 150 gm produces an extension of 2.9 cm, then what weight would produce an extension of 17.4 cm?
In 10 days, the earth picks up 2.6 × 108 pounds of dust from the atmosphere. How much dust will it pick up in 45 days?
Rohan can paint \[\frac{1}{3}\] of a painting in 6 days. How many days will he take to complete the painting?
A, B and C can reap a field in \[15\frac{3}{4}\] days; B, C and D in 14 days; C, D and A in 18 days; D, A and B in 21 days. In what time can A, B, C and D together reap it?
If 12 boys earn Rs 840 in 7 days, what will 15 boys earn in 6 days?
The area of cultivated land and the crop harvested is a case of direct proportion.
It is given that l varies directly as m. Find l, when m is 33.
It is given that l varies directly as m. Find m when l is 8.
A swimming pool can be filled in 4 hours by 8 pumps of the same type. How many such pumps are required if the pool is to be filled in `2 2/3` hours?
Shabnam takes 20 minutes to reach her school if she goes at a speed of 6 km/h. If she wants to reach school in 24 minutes, what should be her speed?