प्रश्न
A, B and C working together can do a piece of work in 8 hours. A alone can do it in 20 hours and B alone can do it in 24 hours. In how many hours will C alone do the same work?
Advertisements
उत्तर
\[\text{ Time taken by A to do the work = 20 hours } \]
\[\text{ Time taken by B to do the work = 24 hours} \]
\[\text{ Time taken by } \left( A + B + C \right) \text{ to do the work = 8 hours } \]
\[\text{ Now, } \]
\[ \text{ Work done by A } = \frac{1}{20}\]
\[ \text{ Work done by B } = \frac{1}{24}\]
\[ \text{ Work done by } \left( A + B + C \right) = \frac{1}{8}\]
\[ \therefore \text{ Work done by C } = \frac{1}{8} - \left( \frac{1}{20} + \frac{1}{24} \right)\]
\[ = \frac{1}{8} - \left( \frac{6}{120} + \frac{5}{120} \right) = \frac{1}{8} - \left( \frac{11}{120} \right)\]
\[ = \frac{15 - 11}{120} = \frac{4}{120} = \frac{1}{30}\]
\[\text{ Thus, C can do the work in 30 hours .} \]
संबंधित प्रश्न
A 5 m 60 cm high vertical pole casts a shadow 3 m 20 cm long. Find at the same time the length of the shadow cast by another pole 10 m 50 cm high.
Anupama takes 125 minutes in walking a distance of 100 metre. What distance would she cover in 315 minutes?
6 men can complete the electric fitting in a building in 7 days. How many days will it take if 21 men do the job?
Two mobiles cost 16,000 rupees. How much money will be required to buy 13 such mobiles?
The shadow of a pole with height of 8 m is 6 m. If the shadow of another pole measured at the same time is 30 m, find the height of the pole?
Both x and y vary directly with each other and when x is 10, y is 14, which of the following is not a possible pair of corresponding values of x and y?
An auto rickshaw takes 3 hours to cover a distance of 36 km. If its speed is increased by 4 km/h, the time taken by it to cover the same distance is ______.
If the area occupied by 15 postal stamps is 60 cm2, then the area occupied by 120 such postal stamps will be ______.
Write whether the following statement vary directly, vary inversely with each other, or neither of the two.
The number of people working and the quantity of work.
The cost of 27 kg of iron is Rs 1,080, what will be the cost of 120 kg of iron of the same quality?