Advertisements
Advertisements
Question
Which of the following quantities vary inversely as other?
The number of x men hired to construct a wall and the time y taken to finish the job.
Advertisements
Solution
If the number of men is more, the time taken to construct a wall will be less. Therefore, it is in inverse variation.
Thus, only is in inverse variation.
APPEARS IN
RELATED QUESTIONS
A batch of bottles was packed in 25 boxes with 12 bottles in each box. If the same batch is packed using 20 bottles in each box, how many boxes would be filled?

It x and y vary inversely, fill in the following blank:
| x | 16 | 32 | 8 | 128 |
| y | 4 | ... | ... | 0.25 |
If 36 men can do a piece of work in 25 days, in how many days will 15 men do it?
A work force of 50 men with a contractor can finish a piece of work in 5 months. In how many months the same work can be completed by 125 men?
55 cows can graze a field in 16 days. How many cows will graze the same field in 10 days?
If x and y vary inversely as other and x = 30, find y when constant of variation = 900.
6 pipes are required to fill a tank in 1 hour 20 minutes. How long will it take if only 5 pipes of the same type are used?
Forty students stay in a hostel. They had food stock for 30 days. If the students are doubled then for how many days the stock will last?
Neelaveni goes by bicycle to her school every day. Her average speed is 12 km/hr and she reaches school in 20 minutes. What is the increase in speed, If she reaches the school in 15 minutes?
Length of a side of an equilateral triangle and its perimeter vary inversely with each other.
