Which of the following quantities vary inversely as other?
The number of x men hired to construct a wall and the time y taken to finish the job.
Advertisements
Solution
If the number of men is more, the time taken to construct a wall will be less. Therefore, it is in inverse variation.
Thus, only is in inverse variation.
RELATED QUESTIONS
Find the constant of variation from the table given below:
| x | 3 | 5 | 7 | 9 |
| y | 12 | 20 | 28 | 36 |
Set up a table and solve the following problems. Use unitary method to verify the answer.
A work-force of 420 men with a contractor can finish a certain piece of work in 9 months. How many extra men must he employ to complete the job in 7 months?
Raghu has enough money to buy 75 machines worth Rs 200 each. How many machines can he buy if he gets a discount of Rs 50 on each machine?
Mary cycles at 6 km per hour. How long will she take to reach her Aunt’s house which is 12 km away? If she cycles at a speed of 4 km/hr, how long would she take?
Neelaveni goes by bicycle to her school every day. Her average speed is 12 km/hr and she reaches school in 20 minutes. What is the increase in speed, If she reaches the school in 15 minutes?
4 typists are employed to complete a work in 12 days. If two more typists are added, they will finish the same work in _________ days
In a school there is 7 periods a day each of 45 minutes duration. How long each period is if the school has 9 periods a day assuming the number of hours to be the same?
If 12 pumps can empty a reservoir in 20 hours, then time required by 45 such pumps to empty the same reservoir is ______ hours.
If two quantities p and q vary inversely with each other then ______ of their corresponding values remains constant.
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
| a | 2 | y | 6 | 10 |
| b | x | 12.5 | 15 | z |