Advertisements
Advertisements
प्रश्न
Which of the following quantities vary inversely as other?
The number of x men hired to construct a wall and the time y taken to finish the job.
Advertisements
उत्तर
If the number of men is more, the time taken to construct a wall will be less. Therefore, it is in inverse variation.
Thus, only is in inverse variation.
APPEARS IN
संबंधित प्रश्न
Two persons could fit new windows in house in 3 days.
One of the persons fell ill before the work started. How long would the job take now?
In a hostel of 50 girls, there are food provisions for 40 days. If 30 more girls join the hostel, how long will these provisions last?
Six men can complete a work in 12 days. Two days later, 6 more men joined them. How many days will they take to complete the remaining work?
If 12 pumps can empty a reservoir in 20 hours, then time required by 45 such pumps to empty the same reservoir is ______ hours.
When the speed is kept fixed, time and distance vary inversely with each other.
Length of a side of an equilateral triangle and its perimeter vary inversely with each other.
If d varies directly as t2, then we can write dt2 = k, where k is some constant.
If x and y are in inverse proportion, then (x + 1) and (y + 1) are also in inverse proportion.
If one angle of a triangle is kept fixed then the measure of the remaining two angles vary inversely with each other.
If x varies inversely as y and y = 60 when x = 1.5. Find x. when y = 4.5.
