Advertisements
Advertisements
Question
If x and y vary inversely as other and x = 5 when y = 15, find x when y = 12 .
Advertisements
Solution
\[ \text{ Since x and y vary inversely, we have: } \]
\[xy = k\]
\[ \text{ For x = 5 and y = 15, we have: } \]
\[5 \times 15 = k\]
\[ \Rightarrow k = 75\]
\[\text{ For y = 12, we have: } \]
\[12x = 75\]
\[ \Rightarrow x = \frac{75}{12}\]
\[ = \frac{25}{4}\]
\[ \therefore x = \frac{25}{4}\]
APPEARS IN
RELATED QUESTIONS
A batch of bottles was packed in 25 boxes with 12 bottles in each box. If the same batch is packed using 20 bottles in each box, how many boxes would be filled?

Find the constant of variation from the table given below:
| x | 3 | 5 | 7 | 9 |
| y | 12 | 20 | 28 | 36 |
Set up a table and solve the following problems. Use unitary method to verify the answer.
Which of the following quantities vary inversely as other?
The length x of a journey by bus and price y of the ticket.
18 men can reap a field in 35 days. For reaping the same field in 15 days, how many men are required?
If two quantities p and q vary inversely with each other, then ______
If xy = 10, then x and y vary ______ with each other.
If one angle of a triangle is kept fixed then the measure of the remaining two angles vary inversely with each other.
Write whether the following statement vary directly, vary inversely with each other, or neither of the two.
The time taken by a train to cover a fixed distance and the speed of the train.
A contractor undertook a contract to complete a part of a stadium in 9 months with a team of 560 persons. Later on, it was required to complete the job in 5 months. How many extra persons should he employ to complete the work?
At a particular time, the length of the shadow of Qutub Minar whose height is 72 m is 80 m. What will be the height of an electric pole, the length of whose shadow at the same time is 1000 cm?
