English
Tamil Nadu Board of Secondary EducationHSC Commerce Class 12

Write any 2 examples for Poisson distribution

Advertisements
Advertisements

Question

Write any 2 examples for Poisson distribution

Sum
Advertisements

Solution

1. The number of alpha particles emitted by a radioactive substance in a fraction of a second.

2. Number of road accidents occurring at a particular interval of time per day.

shaalaa.com
Distribution
  Is there an error in this question or solution?
Chapter 7: Probability Distributions - Exercise 7.2 [Page 159]

APPEARS IN

Samacheer Kalvi Business Mathematics and Statistics [English] Class 12 TN Board
Chapter 7 Probability Distributions
Exercise 7.2 | Q 2 | Page 159

RELATED QUESTIONS

If 5% of the items produced turn out to be defective, then find out the probability that out of 20 items selected at random there are exactly 4 defectives


Defects in yarn manufactured by a local mill can be approximated by a distribution with a mean of 1.2 defects for every 6 metres of length. If lengths of 6 metres are to be inspected, find the probability of less than 2 defects


The average number of customers, who appear in a counter of a certain bank per minute is two. Find the probability that during a given minute no customer appears


In a test on 2,000 electric bulbs, it was found that bulbs of a particular make, was normally distributed with an average life of 2,040 hours and standard deviation of 60 hours. Estimate the number of bulbs likely to burn for more than 2,150 hours


In a test on 2,000 electric bulbs, it was found that bulbs of a particular make, was normally distributed with an average life of 2,040 hours and standard deviation of 60 hours. Estimate the number of bulbs likely to burn for more 1,920 hours but less than 2,100 hours


Time taken by a construction company to construct a flyover is a normal variate with mean 400 labour days and a standard deviation of 100 labour days. If the company promises to construct the flyover in 450 days or less and agree to pay a penalty of ₹ 10,000 for each labour day spent in excess of 450. What is the probability that the company takes at most 500 days to complete the flyover?


Choose the correct alternative:

The random variable X is normally distributed with a mean of 70 and a standard deviation of 10. What is the probability that X is between 72 and 84?


Choose the correct alternative:

Using the standard normal table, the sum of the probabilities to the right of z = 2.18 and to the left of z = – 1.75 is


The time taken to assemble a car in a certain plant is a random variable having a normal distribution of 20 hours and a standard deviation of 2 hours. What is the probability that a car can be assembled at this plant in a period of time. Between 20 and 22 hours?


X is a normally distributed variable with mean µ = 30 and standard deviation σ = 4. Find P(X < 40)


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×