Question
Choose the correct alternative:
Using the standard normal table, the sum of the probabilities to the right of z = 2.18 and to the left of z = – 1.75 is
Options
0.4854
0.4599
0.0146
0.0547
Advertisements
Solution
0.0547
APPEARS IN
RELATED QUESTIONS
If 5% of the items produced turn out to be defective, then find out the probability that out of 20 items selected at random there are atleast two defectives
Among 28 professors of a certain department, 18 drive foreign cars and 10 drive local made cars. If 5 of these professors are selected at random, what is the probability that atleast 3 of them drive foreign cars?
Out of 750 families with 4 children each, how many families would be expected to have atmost 2 girls
Out of 750 families with 4 children each, how many families would be expected to have children of both sexes? Assume equal probabilities for boys and girls.
A car hiring firm has two cars. The demand for cars on each day is distributed as a Poison variate, with mean 1.5. Calculate the proportion of days on which neither car is used
The average number of customers, who appear in a counter of a certain bank per minute is two. Find the probability that during a given minute no customer appears
The average number of customers, who appear in a counter of a certain bank per minute is two. Find the probability that during a given minute three or more customers appear
In a test on 2,000 electric bulbs, it was found that bulbs of a particular make, was normally distributed with an average life of 2,040 hours and standard deviation of 60 hours. Estimate the number of bulbs likely to burn for more than 2,150 hours
Time taken by a construction company to construct a flyover is a normal variate with mean 400 labour days and a standard deviation of 100 labour days. If the company promises to construct the flyover in 450 days or less and agree to pay a penalty of ₹ 10,000 for each labour day spent in excess of 450. What is the probability that the company takes at most 500 days to complete the flyover?
The time taken to assemble a car in a certain plant is a random variable having a normal distribution of 20 hours and a standard deviation of 2 hours. What is the probability that a car can be assembled at this plant in a period of time. Less than 19.5 hours?