English
Tamil Nadu Board of Secondary EducationHSC Commerce Class 12

Choose the correct alternative: Using the standard normal table, the sum of the probabilities to the right of z = 2.18 and to the left of z = – 1.75 is

Advertisements
Advertisements

Question

Choose the correct alternative:

Using the standard normal table, the sum of the probabilities to the right of z = 2.18 and to the left of z = – 1.75 is

Options

  • 0.4854

  • 0.4599

  • 0.0146

  • 0.0547

MCQ
Advertisements

Solution

0.0547

shaalaa.com
Distribution
  Is there an error in this question or solution?
Chapter 7: Probability Distributions - Exercise 7.4 [Page 170]

APPEARS IN

Samacheer Kalvi Business Mathematics and Statistics [English] Class 12 TN Board
Chapter 7 Probability Distributions
Exercise 7.4 | Q 20 | Page 170

RELATED QUESTIONS

If 18% of the bolts produced by a machine are defective, determine the probability that out of the 4 bolts chosen at random none will be defective


Forty percent of business travellers carry a laptop. In a sample of 15 business travelers, what is the probability that atleast three of the travelers have a laptop?


Consider five mice from the same litter, all suffering from Vitamin A deficiency. They are fed a certain dose of carrots. The positive reaction means recovery from the disease. Assume that the probability of recovery is 0.73. What is the probability that atleast 3 of the 5 mice recover


Derive the mean and variance of poisson distribution


In a photographic process, the developing time of prints may be looked upon as a random variable having the normal distribution with a mean of 16.28 seconds and a standard deviation of 0.12 second. Find the probability that it will take less than 16.35 seconds to develop prints


Time taken by a construction company to construct a flyover is a normal variate with mean 400 labour days and a standard deviation of 100 labour days. If the company promises to construct the flyover in 450 days or less and agree to pay a penalty of ₹ 10,000 for each labour day spent in excess of 450. What is the probability that the company pay a penalty of at least ₹ 2,00,000?


Time taken by a construction company to construct a flyover is a normal variate with mean 400 labour days and a standard deviation of 100 labour days. If the company promises to construct the flyover in 450 days or less and agree to pay a penalty of ₹ 10,000 for each labour day spent in excess of 450. What is the probability that the company takes at most 500 days to complete the flyover?


Choose the correct alternative:

If Z is a standard normal variate, the proportion of items lying between Z = – 0.5 and Z = – 3.0 is


Choose the correct alternative:

Monthly expenditure on their credit cards, by credit cardholders from a certain bank, follows a normal distribution with a mean of ₹ 1,295.00 and a standard deviation of ₹ 750.00. What proportion of credit cardholders spend more than ₹ 1,500.00 on their credit cards per month?


A manufacturer of metal pistons finds that on the average, 12% of his pistons are rejected because they are either oversize or undersize. What is the probability that a batch of 10 pistons will contain at least 2 rejects?


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×