Question
If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
Advertisements
Solution
70 men dig 15,000 sq. m of a field in 5 days
1 man can dig 15,000 sq. m of a field in =`(5xx70)/ (15,000)`
Men required to dig 22,500 sq. m. a field in 25 days
`=(5xx70xx22500)/(15,000xx25)=(70xx900)/3000=63/3=21`
Hence required to dig 22,500 sq. m field in 25 days = 21
APPEARS IN
RELATED QUESTIONS
If `2/9` of property costs Rs.2,52,000; find the cost of `4/7` of it.
16 boys went to the canteen to have tea and snacks together. The bill amounted to Rs. 114.40. What will be the contribution of a boy who pays for himself and 5 others?
50 labourers can dig a pond in 16 days. How many labourers will be required to dig another pond, double in size in 20 days?
One tap can fill a cistern in 3 hours and the waste pipe can empty the full cistern in 5 hours. In what time will the empty cistern be full, if the tap and the waste pipe are kept open together?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 15 soaps?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 3 dozen soaps?
If the cost of 8 cans of juice is ₹ 280, then what will be the cost of 6 cans of juice?
Weight of 15 books is 6 kg. What is the weight of 45 such books?
The temperature dropped 18 degree Celsius in the last 24 days. If the rate of temperature drop remains the same, how many degrees will the temperature drop in the next 18 days?
If a deposit of ₹ 2,000 earns an interest of ₹ 500 in 3 years, how much interest would a deposit of ₹ 36,000 earn in 3 years with the same rate of simple interest?