Question
If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
Advertisements
Solution
70 men dig 15,000 sq. m of a field in 5 days
1 man can dig 15,000 sq. m of a field in =`(5xx70)/ (15,000)`
Men required to dig 22,500 sq. m. a field in 25 days
`=(5xx70xx22500)/(15,000xx25)=(70xx900)/3000=63/3=21`
Hence required to dig 22,500 sq. m field in 25 days = 21
APPEARS IN
RELATED QUESTIONS
If `2/9` of property costs Rs.2,52,000; find the cost of `4/7` of it.
Six taps can fill an empty cistern in 8 hours. How much more time will be taken, if two taps go out of order? Assume, all the taps supply water at the same rate.
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
One tap can fill a cistern in 3 hours and the waste pipe can empty the full cistern in 5 hours. In what time will the empty cistern be full, if the tap and the waste pipe are kept open together?
The price of 25 identical articles is ₹1,750. Find the price of one article
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in 2.5 litres of petrol?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 15 soaps?
A motorbike travels 425 km in 5 hours. How much distance will be covered by it in 3.2 hours?
Rohit buys 10 pens for ₹ 150 and Manoj buys 14 pens for ₹ 168. Who got the pens cheaper?
In the unitary method, which mathematical operation is used to convert the value of "many" units to the value of "one" unit?