Advertisements
Advertisements
प्रश्न
If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
Advertisements
उत्तर
70 men dig 15,000 sq. m of a field in 5 days
1 man can dig 15,000 sq. m of a field in =`(5xx70)/ (15,000)`
Men required to dig 22,500 sq. m. a field in 25 days
`=(5xx70xx22500)/(15,000xx25)=(70xx900)/3000=63/3=21`
Hence required to dig 22,500 sq. m field in 25 days = 21
APPEARS IN
संबंधित प्रश्न
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in one litre of petrol?
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in 2.5 litres of petrol?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of each soap?
If the cost of 8 cans of juice is ₹ 280, then what will be the cost of 6 cans of juice?
For ₹ 378, 9 cans of juice can be bought, then how many cans of juice can be bought for ₹ 504?
If the cost of a dozen identical articles is ₹ 672, what will be the cost of 18 such articles?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
A truck requires 108 litres of diesel for covering a distance of 1188 km. How much diesel will be required by the truck to cover a distance of 3300 km?
In a particular week, a man works for 48 hours and earns ₹ 4,320. But in the next week he worked 6 hours less, how much has he earned in this week?
If 18 pencils cost ₹54, what is the cost of 6 pencils?
