If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
Advertisements
उत्तर
70 men dig 15,000 sq. m of a field in 5 days
1 man can dig 15,000 sq. m of a field in =`(5xx70)/ (15,000)`
Men required to dig 22,500 sq. m. a field in 25 days
`=(5xx70xx22500)/(15,000xx25)=(70xx900)/3000=63/3=21`
Hence required to dig 22,500 sq. m field in 25 days = 21
APPEARS IN
संबंधित प्रश्न
Eight oranges can be bought for Rs. 10.40. How many more can be bought for Rs.16.90?
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of each soap?
For ₹ 378, 9 cans of juice can be bought, then how many cans of juice can be bought for ₹ 504?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
A loaded truck travels 18 km in 25 minutes. If the speed remains the same, how far can it travel in 5 hours?
The temperature dropped 18 degree Celsius in the last 24 days. If the rate of temperature drop remains the same, how many degrees will the temperature drop in the next 18 days?
Mr. Chopra pays ₹ 12,000 as rent for 3 months. How much does he has to pay for a year if the rent per month remains same?
In a particular week, a man works for 48 hours and earns ₹ 4,320. But in the next week he worked 6 hours less, how much has he earned in this week?
Once the value of a single unit is known, which operation is used to find the value of "many" units?