If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
Advertisements
उत्तर
70 men dig 15,000 sq. m of a field in 5 days
1 man can dig 15,000 sq. m of a field in =`(5xx70)/ (15,000)`
Men required to dig 22,500 sq. m. a field in 25 days
`=(5xx70xx22500)/(15,000xx25)=(70xx900)/3000=63/3=21`
Hence required to dig 22,500 sq. m field in 25 days = 21
APPEARS IN
संबंधित प्रश्न
If 10 horses consume 18 bushels in 36 days. How long will 24 bushels last for 30 horses?
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in one litre of petrol?
For ₹ 378, 9 cans of juice can be bought, then how many cans of juice can be bought for ₹ 504?
A motorbike travels 425 km in 5 hours. How much distance will be covered by it in 3.2 hours?
A loaded truck travels 18 km in 25 minutes. If the speed remains the same, how far can it travel in 5 hours?
Weight of 15 books is 6 kg. What is the weight of 45 such books?
Geeta types 108 words in 6 minutes. How many words would she type in half an hour?
The temperature dropped 18 degree Celsius in the last 24 days. If the rate of temperature drop remains the same, how many degrees will the temperature drop in the next 18 days?
In a particular week, a man works for 48 hours and earns ₹ 4,320. But in the next week he worked 6 hours less, how much has he earned in this week?