Advertisements
Advertisements
प्रश्न
A contractor undertakes to build a wall 1000 m long in 50 days. He employs 56 men, but at the end of 27 days, he finds that only 448 m of wall is built. How many extra men must the contractor employ so that the wall is completed in time?
Advertisements
उत्तर
Number of men employed in the beginning = 56
Length of wall = 1000 m No. of days = 50
In the time of 27 days, only 448 m of the wall was completed
Remaining period = 50 – 27 = 23 days
and length of wall to be completed = 1000 – 448 = 552
Now in 27 days, 448 m long wall was completed by = 1000 m
in 1 day, 448 m long was completed by = 56 x 27
in 1 day, 1 m long wall will be completed by
`=(56xx27)/448` m
and in 23 days 552 m long wall be completed by
`=(56xx27xx552)/(448xx23)` men
`=(1xx27xx24)/8` = 81 men
∴ No. of extra men required
= 81 − 56 = 25 men
APPEARS IN
संबंधित प्रश्न
Eight oranges can be bought for Rs. 10.40. How many more can be bought for Rs.16.90?
Fifteen men can build a wall in 60 days. How many more men are required to build another wall of the same size in 45 days?
A car covers a distance of 180 km in 5 hours. How much distance will the car cover in 3 hours with the same speed?
Rohit buys 10 pens for ₹ 150 and Manoj buys 14 pens for ₹ 168. Who got the pens cheaper?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
A loaded truck travels 18 km in 25 minutes. If the speed remains the same, how far can it travel in 5 hours?
If a deposit of ₹ 2,000 earns an interest of ₹ 500 in 3 years, how much interest would a deposit of ₹ 36,000 earn in 3 years with the same rate of simple interest?
25 metres of cloth costs ₹ 1,012.50. How many metres of the same kind can be bought for ₹ 1,620?
In a particular week, a man works for 48 hours and earns ₹ 4,320. But in the next week he worked 6 hours less, how much has he earned in this week?
If 18 pencils cost ₹54, what is the cost of 6 pencils?
