A contractor undertakes to build a wall 1000 m long in 50 days. He employs 56 men, but at the end of 27 days, he finds that only 448 m of wall is built. How many extra men must the contractor employ so that the wall is completed in time?
Advertisements
उत्तर
Number of men employed in the beginning = 56
Length of wall = 1000 m No. of days = 50
In the time of 27 days, only 448 m of the wall was completed
Remaining period = 50 – 27 = 23 days
and length of wall to be completed = 1000 – 448 = 552
Now in 27 days, 448 m long wall was completed by = 1000 m
in 1 day, 448 m long was completed by = 56 x 27
in 1 day, 1 m long wall will be completed by
`=(56xx27)/448` m
and in 23 days 552 m long wall be completed by
`=(56xx27xx552)/(448xx23)` men
`=(1xx27xx24)/8` = 81 men
∴ No. of extra men required
= 81 − 56 = 25 men
APPEARS IN
संबंधित प्रश्न
`3/5` quintal of wheat costs Rs.210. Find the cost of :
(i) 1 quintal of wheat
(ii) 0.4 quintal of wheat
If 12 men and 16 boys can do a piece of work in 5 days and, 13 men and 24 boys can do it in 4 days, how long will 7 men and 10 boys take to do it?
Six taps can fill an empty cistern in 8 hours. How much more time will be taken, if two taps go out of order? Assume, all the taps supply water at the same rate.
A family of 5 persons can be maintained for 20 days with Rs.2,480. Find, how long Rs.6944 maintains a family of 8 persons?
The price of 25 identical articles is ₹1,750. Find the price of 13 articles
If the cost of a dozen soaps is ₹ 460.80, what will the cost of each soap?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 15 soaps?
For ₹ 378, 9 cans of juice can be bought, then how many cans of juice can be bought for ₹ 504?
A made 84 runs in 6 overs and B made 126 runs in 7 overs. Who made more runs per over?
Mr. Chopra pays ₹ 12,000 as rent for 3 months. How much does he has to pay for a year if the rent per month remains same?