A group of labourers promises to do a piece of work in 10 days, but five of them become absent. If the remaining labourers complete the work in 12 days, find their original number in the group.
Advertisements
उत्तर
Total period = 10 days
But work completed in = 12 days
No. of men was absent = 5
Let the number of men in the beginning = x
Now x men can do piece work in = 10 days
1 man will do it in = 10x × days
and (x − 5) will do it in =`(10xx"x")/("x"-5)` days
∴ `(10"x")/("x"-5)=12`
⇒ 10x = 12x − 60
⇒ 12x − 10x = 60 ⇒ 2x = 60
⇒ x =`60/2` = 30
∴ No. of men in the beginning = 30
APPEARS IN
संबंधित प्रश्न
Eight oranges can be bought for Rs. 10.40. How many more can be bought for Rs.16.90?
Fifteen men can build a wall in 60 days. How many more men are required to build another wall of the same size in 45 days?
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in 2.5 litres of petrol?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 15 soaps?
The cost of 35 envelops is ₹ 105. How many envelops can be bought for ₹ 90?
If the cost of a dozen identical articles is ₹ 672, what will be the cost of 18 such articles?
Cost of 10 kg of wheat is ₹ 180. What is the cost of 18 kg of wheat?
If John walks 250 steps to cover a distance of 200 metres, find the distance covered by him in 350 steps
30 identical articles weigh 360 g. How many articles will weigh 840 g?