Advertisements
Advertisements
प्रश्न
A group of labourers promises to do a piece of work in 10 days, but five of them become absent. If the remaining labourers complete the work in 12 days, find their original number in the group.
Advertisements
उत्तर
Total period = 10 days
But work completed in = 12 days
No. of men was absent = 5
Let the number of men in the beginning = x
Now x men can do piece work in = 10 days
1 man will do it in = 10x × days
and (x − 5) will do it in =`(10xx"x")/("x"-5)` days
∴ `(10"x")/("x"-5)=12`
⇒ 10x = 12x − 60
⇒ 12x − 10x = 60 ⇒ 2x = 60
⇒ x =`60/2` = 30
∴ No. of men in the beginning = 30
APPEARS IN
संबंधित प्रश्न
50 labourers can dig a pond in 16 days. How many labourers will be required to dig another pond, double in size in 20 days?
If 12 men and 16 boys can do a piece of work in 5 days and, 13 men and 24 boys can do it in 4 days, how long will 7 men and 10 boys take to do it?
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
A contractor undertakes to build a wall 1000 m long in 50 days. He employs 56 men, but at the end of 27 days, he finds that only 448 m of wall is built. How many extra men must the contractor employ so that the wall is completed in time?
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in 2.5 litres of petrol?
The cost of 35 envelops is ₹ 105. How many envelops can be bought for ₹ 90?
For ₹ 378, 9 cans of juice can be bought, then how many cans of juice can be bought for ₹ 504?
A car covers a distance of 180 km in 5 hours. How much time will the car take to cover 54 km with the same speed?
Geeta types 108 words in 6 minutes. How many words would she type in half an hour?
25 metres of cloth costs ₹ 1,012.50. What will be the cost of 20 metres of cloth of the same type?
