A group of labourers promises to do a piece of work in 10 days, but five of them become absent. If the remaining labourers complete the work in 12 days, find their original number in the group.
Advertisements
उत्तर
Total period = 10 days
But work completed in = 12 days
No. of men was absent = 5
Let the number of men in the beginning = x
Now x men can do piece work in = 10 days
1 man will do it in = 10x × days
and (x − 5) will do it in =`(10xx"x")/("x"-5)` days
∴ `(10"x")/("x"-5)=12`
⇒ 10x = 12x − 60
⇒ 12x − 10x = 60 ⇒ 2x = 60
⇒ x =`60/2` = 30
∴ No. of men in the beginning = 30
APPEARS IN
संबंधित प्रश्न
If `2/9` of property costs Rs.2,52,000; find the cost of `4/7` of it.
Six taps can fill an empty cistern in 8 hours. How much more time will be taken, if two taps go out of order? Assume, all the taps supply water at the same rate.
If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
Ten men, working for 6 days of 10 hours each, finish `5/21` of a piece of work. How many men working at the same rate and for the same number of hours each day, will be required to complete the remaining work in 8 days?
The price of 25 identical articles is ₹1,750. Find the price of 13 articles
If the cost of a dozen soaps is ₹ 460.80, what will the cost of each soap?
The cost of 35 envelops is ₹ 105. How many envelops can be bought for ₹ 90?
A car covers a distance of 180 km in 5 hours. How much time will the car take to cover 54 km with the same speed?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
Weight of 15 books is 6 kg. What is the weight of 45 such books?