प्रश्न
A group of labourers promises to do a piece of work in 10 days, but five of them become absent. If the remaining labourers complete the work in 12 days, find their original number in the group.
Advertisements
उत्तर
Total period = 10 days
But work completed in = 12 days
No. of men was absent = 5
Let the number of men in the beginning = x
Now x men can do piece work in = 10 days
1 man will do it in = 10x × days
and (x − 5) will do it in =`(10xx"x")/("x"-5)` days
∴ `(10"x")/("x"-5)=12`
⇒ 10x = 12x − 60
⇒ 12x − 10x = 60 ⇒ 2x = 60
⇒ x =`60/2` = 30
∴ No. of men in the beginning = 30
APPEARS IN
संबंधित प्रश्न
If 12 men and 16 boys can do a piece of work in 5 days and, 13 men and 24 boys can do it in 4 days, how long will 7 men and 10 boys take to do it?
Fifteen men can build a wall in 60 days. How many more men are required to build another wall of the same size in 45 days?
The cost of 35 envelops is ₹ 105. How many envelops can be bought for ₹ 90?
A motorbike travels 425 km in 5 hours. How much distance will be covered by it in 3.2 hours?
Cost of 10 kg of wheat is ₹ 180. What quantity of wheat can be purchased in ₹ 432?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
A truck requires 108 litres of diesel for covering a distance of 1188 km. How much diesel will be required by the truck to cover a distance of 3300 km?
25 metres of cloth costs ₹ 1,012.50. What will be the cost of 20 metres of cloth of the same type?
25 metres of cloth costs ₹ 1,012.50. How many metres of the same kind can be bought for ₹ 1,620?
30 identical articles weigh 360 g. How many articles will weigh 840 g?