प्रश्न
Ten men, working for 6 days of 10 hours each, finish `5/21` of a piece of work. How many men working at the same rate and for the same number of hours each day, will be required to complete the remaining work in 8 days?
Advertisements
उत्तर
Work does one =`5/21`
Remaining work =`1-5/21=16/21`
`5/21` of a work can be done in 6 days working 10 hours a day by = 10 m
1 work can be done in 6 days working 10 hours a day by =`(10xx21)/5`
1 work can be done in 1 day working 10 hours a day by =`(10xx21xx6)/5` men
`16/21` work can be done in 8 days working 10 hours a day by =`(10xx21xx6xx16)/(5xx21xx8)` = 24 men
APPEARS IN
संबंधित प्रश्न
50 labourers can dig a pond in 16 days. How many labourers will be required to dig another pond, double in size in 20 days?
If 12 men and 16 boys can do a piece of work in 5 days and, 13 men and 24 boys can do it in 4 days, how long will 7 men and 10 boys take to do it?
Fifteen men can build a wall in 60 days. How many more men are required to build another wall of the same size in 45 days?
One tap can fill a cistern in 3 hours and the waste pipe can empty the full cistern in 5 hours. In what time will the empty cistern be full, if the tap and the waste pipe are kept open together?
If the cost of a dozen identical articles is ₹ 672, what will be the cost of 18 such articles?
Cost of 10 kg of wheat is ₹ 180. What is the cost of 18 kg of wheat?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
A truck requires 108 litres of diesel for covering a distance of 1188 km. How much diesel will be required by the truck to cover a distance of 3300 km?
25 metres of cloth costs ₹ 1,012.50. How many metres of the same kind can be bought for ₹ 1,620?
Once the value of a single unit is known, which operation is used to find the value of "many" units?