Question
If 40 workers can do a project work in 8 days, then _________ workers can do it in 4 days
Advertisements
Solution
If 40 workers can do a project work in 8 days, then 80 workers can do it in 4 days
APPEARS IN
RELATED QUESTIONS
Which of the following are in inverse proportion?
The population of a country and the area of land per person.
A contractor estimates that 3 persons could rewire Jasminder’s house in 4 days. If, he uses 4 persons instead of three, how long should they take to complete the job?
A car takes 2 hours to reach a destination by travelling at the speed of 60 km/h. How long will it take when the car travels at the speed of 80 km/h?
It is known that for a given mass of gas, the volume v varies inversely as the pressure p. Fill in the missing entries in the following table:
| v (in cm3) | ... | 48 | 60 | ... | 100 | ... | 200 |
| p (in atmospheres) | 2 | ... | 3/2 | 1 | ... | 1/2 | ... |
16 taps can fill a petrol tank in 18 minutes. The time taken for 9 taps to fill the same tank will be _________ minutes
6 pumps are required to fill a water sump in 1 hr 30 minutes. What will be the time taken to fill the sump if one pump is switched off?
Forty students stay in a hostel. They had food stock for 30 days. If the students are doubled then for how many days the stock will last?
If xy = 10, then x and y vary ______ with each other.
When two quantities x and y are in ______ proportion or vary ______ they are written as `x oo 1/y`.
If x varies inversely as y and y = 60 when x = 1.5. Find x. when y = 4.5.