Choose the correct alternative:
The assignable causes can occur due to
Options
poor raw materials
unskilled labour
faulty machines
all of them
Advertisements
Solution
all of them
APPEARS IN
RELATED QUESTIONS
Define Statistical Quality Control
Define chance cause
Define assignable cause
Write the control limits for the R chart
Ten samples each of size five are drawn at regular intervals from a manufacturing process. The sample means `(bar"X")` and their ranges (R) are given below:
| Sample number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| `bar"X"` | 49 | 45 | 48 | 53 | 39 | 47 | 46 | 39 | 51 | 45 |
| R | 7 | 5 | 7 | 9 | 5 | 8 | 8 | 6 | 7 | 6 |
Calculate the control limits in respect of `bar"X"` chart. (Given A2 = 0.58, D3 = 0 and D4 = 2.115) Comment on the state of control
Construct `bar"X"` and R charts for the following data:
| Sample Number | Observations | ||
| 1 | 32 | 36 | 42 |
| 2 | 28 | 32 | 40 |
| 3 | 39 | 52 | 28 |
| 4 | 50 | 42 | 31 |
| 5 | 42 | 45 | 34 |
| 6 | 50 | 29 | 21 |
| 7 | 44 | 52 | 35 |
| 8 | 22 | 35 | 44 |
(Given for n = 3, A2 = 1.023, D3 = 0 and D4 = 2.574)
A quality control inspector has taken ten samples of size four packets each from a potato chips company. The contents of the sample are given below, Calculate the control limits for mean and range chart.
| Sample Number | Observations | |||
| 1 | 2 | 3 | 4 | |
| 1 | 12.5 | 12.3 | 12.6 | 12.7 |
| 2 | 12.8 | 12.4 | 12.4 | 12.8 |
| 3 | 12.1 | 12.6 | 12.5 | 12.4 |
| 4 | 12.2 | 12.6 | 12.5 | 12.3 |
| 5 | 12.4 | 12.5 | 12.5 | 12.5 |
| 6 | 12.3 | 12.4 | 12.6 | 12.6 |
| 7 | 12.6 | 12.7 | 12.5 | 12.8 |
| 8 | 12.4 | 12.3 | 12.6 | 12.5 |
| 9 | 12.6 | 12.5 | 12.3 | 12.6 |
| 10 | 12.1 | 12.7 | 12.5 | 12.8 |
(Given for n = 5, A2 = 0.58, D3 = 0 and D4 = 2.115)
Choose the correct alternative:
`bar"X"` chart is a
The following data gives the average life(in hours) and range of 12 samples of 5lamps each. The data are
| Sample No | 1 | 2 | 3 | 4 | 5 | 6 |
| Sample Mean | 1080 | 1390 | 1460 | 1380 | 1230 | 1370 |
| Sample Range | 410 | 670 | 180 | 320 | 690 | 450 |
| Sample No | 7 | 8 | 9 | 10 | 11 | 12 |
| Sample Mean | 1310 | 1630 | 1580 | 1510 | 1270 | 1200 |
| Sample Range | 380 | 350 | 270 | 660 | 440 | 310 |
Construct control charts for mean and range. Comment on the control limits.
The following are the sample means and I ranges for 10 samples, each of size 5. Calculate; the control limits for the mean chart and range chart and state whether the process is in control or not.
| Sample Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| Mean | 5.10 | 4.98 | 5.02 | 4.96 | 4.96 | 5.04 | 4.94 | 4.92 | 4.92 | 4.98 |
| Range | 0.3 | 0.4 | 0.2 | 0.4 | 0.1 | 0.1 | 0.8 | 0.5 | 0.3 | 0.5 |