At a particular time, the length of the shadow of Qutub Minar whose height is 72 m is 80 m. What will be the height of an electric pole, the length of whose shadow at the same time is 1000 cm?
Advertisements
Solution
∵ Length of Qutub Minar = 72 m
And its shadow at particular time = 80 m
Length of shadow of electric pole = 1000 cm = 10 m ...`[∵ 1 cm = 1/100 m]`
∴ Length of electric pole = `72/80 xx 10` = 9 m
APPEARS IN
RELATED QUESTIONS
In a Television game show, the prize money of Rs 1,00,000 is to be divided equally amongst the winners. Complete the following table and find whether the prize money given to an individual winner is directly or inversely proportional to the number of winners?
| Number of winners | 1 | 2 | 4 | 5 | 8 | 10 | 20 |
| Prize for each winner (in Rs) | 1,00,000 | 50,000 | ... | ... | ... | ... | ... |
A car takes 2 hours to reach a destination by travelling at the speed of 60 km/h. How long will it take when the car travels at the speed of 80 km/h?
In which of the following table x and y vary inversely:
| x | 4 | 3 | 12 | 1 |
| y | 6 | 8 | 2 | 24 |
In which of the following table x and y vary inversely:
| x | 5 | 20 | 10 | 4 |
| y | 20 | 5 | 10 | 25 |
It x and y vary inversely, fill in the following blank:
| x | 16 | 32 | 8 | 128 |
| y | 4 | ... | ... | 0.25 |
16 taps can fill a petrol tank in 18 minutes. The time taken for 9 taps to fill the same tank will be _________ minutes
6 pumps are required to fill a water sump in 1 hr 30 minutes. What will be the time taken to fill the sump if one pump is switched off?
Two quantities are said to vary ______ with each other if an increase in one causes a decrease in the other in such a manner that the product of their corresponding values remains constant.
If on increasing a, b decreases in such a manner that ______ remains ______ and positive, then a and b are said to vary inversely with each other.
A contractor undertook a contract to complete a part of a stadium in 9 months with a team of 560 persons. Later on, it was required to complete the job in 5 months. How many extra persons should he employ to complete the work?