The time required for printing of four books A, B, C and D is 5, 8, 10 and 7 hours while its data entry requires 7, 4, 3 and 6 hrs respectively. The sequence that minimizes total elapsed time is ______.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

One machine - one job is not an assumption in solving sequencing problems.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

Advertisements

State whether the following is True or False :

If there are two least processing times for machine A and machine B, priority is given for the processing time which has lowest time of the adjacent machine.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

State whether the following is True or False :

In a sequencing problem, the processing times are dependent of order of processing the jobs on machines.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

State whether the following is True or False :

One of the assumptions made while sequencing n jobs on 2 machines is: two jobs must be loaded at a time on any machine.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

State whether the following is True or False :

In a sequencing problem, a machine can process more than one job at a time.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

State whether the following is True or False :

The time involved in moving a job from one machine to another is negligibly small.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

Solve the following problem :

A readymade garments manufacturer has to process 7 items through two stages of production, namely cutting and sewing. The time taken in hours for each of these items in different stages are given below:

Items 1 2 3 4 5 6 7
Time for Cutting 5 7 3 4 6 7 12
Time for Sewing 2 6 7 5 9 5 8

Find the sequence in which these items are to be processed through these stages so as to minimize the total processing time. Also find the idle time of each machine.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

Solve the following problem :

Five jobs must pass through a lathe and a surface grinder, in that order. The processing times in hours are shown below. Determine the optimal sequence of the jobs. Also find the idle time of each machine.

Job I II III IV V
Lathe 4 1 5 2 5
Surface grinder 3 2 4 3 6
[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

Solve the following problem :

Find the sequence that minimizes the total elapsed time to complete the following jobs. Each job is processed in order AB.

Machines Jobs (Processing times in minutes)
I II III IV V VI VII
Machine A 12 6 5 11 5 7 6
Machine B 7 8 9 4 7 8 3

Determine the sequence for the jobs so as to minimize the processing time. Find the total elapsed time and the idle times for both the machines.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

A toy manufacturing company produces five types of toys. Each toy has to go through three machines A, B, C in the order ABC. The time required in hours for each process is given in the following table.

Type 1 2 3 4 5
Machine A 16 20 12 14 22
Machine B 10 12 4 6 8
Machine C 8 18 16 12 10

Solve the problem for minimizing the total elapsed time.

[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

Solve the following problem :

A foreman wants to process 4 different jobs on three machines: a shaping machine, a drilling machine and a tapping machine, the sequence of operations being shaping-drilling-tapping. Decide the optimal sequence for the four jobs to minimize the total elapsed time. Also find the total elapsed time and the idle time for every machine.

Job Shaping (Minutes) Drilling (Minutes) Trapping (Minutes)
1 13 3 18
2 18 8 4
3 8 6 13
4 23 6 8
[15] Assignment Problem and Sequencing
Chapter: [15] Assignment Problem and Sequencing
Concept: undefined >> undefined

Choose the correct alternative:

If x = 2am, y = 2am2, where m be the parameter, then `("d"y)/("d"x)` = ? 

[3] Differentiation
Chapter: [3] Differentiation
Concept: undefined >> undefined

If x = `"a"("t" - 1/"t")`, y = `"a"("t" + 1/"t")`, where t be the parameter, then `("d"y)/("d"x)` = ?

[3] Differentiation
Chapter: [3] Differentiation
Concept: undefined >> undefined

State whether the following statement is True or False:

If x = 2at, y = 2a, where t is parameter, then `("d"y)/("d"x) = 1/"t"`

[3] Differentiation
Chapter: [3] Differentiation
Concept: undefined >> undefined

State whether the following statement is True or False:

If x = 5m, y = m, where m is parameter, then `("d"y)/("d"x) = 1/5`

[3] Differentiation
Chapter: [3] Differentiation
Concept: undefined >> undefined

If x = `(4"t")/(1 + "t"^2)`, y = `3((1 - "t"^2)/(1 + "t"^2))`, then show that `("d"y)/("d"x) = (-9x)/(4y)` 

[3] Differentiation
Chapter: [3] Differentiation
Concept: undefined >> undefined

Find `("d"y)/("d"x)`, if x = em, y = `"e"^(sqrt("m"))`

Solution: Given, x = em and y = `"e"^(sqrt("m"))`

Now, y = `"e"^(sqrt("m"))`

Diff.w.r.to m,

`("d"y)/"dm" = "e"^(sqrt("m"))("d"square)/"dm"`

∴ `("d"y)/"dm" = "e"^(sqrt("m"))*1/(2sqrt("m"))`    .....(i)

Now, x = em

Diff.w.r.to m,

`("d"x)/"dm" = square`    .....(ii)

Now, `("d"y)/("d"x) = (("d"y)/("d"m))/square`

∴ `("d"y)/("d"x) = (("e"sqrt("m"))/square)/("e"^"m")`

∴  `("d"y)/("d"x) = ("e"^(sqrt("m")))/(2sqrt("m")*"e"^("m")`

[3] Differentiation
Chapter: [3] Differentiation
Concept: undefined >> undefined

State whether the following statement is True or False:   

A homogeneous differential equation is solved by substituting y = vx and integrating it

[8] Differential Equation and Applications
Chapter: [8] Differential Equation and Applications
Concept: undefined >> undefined

Choose the correct alternative:

The slope of the line of regression of y on x is called the ______

[11] Linear Regression
Chapter: [11] Linear Regression
Concept: undefined >> undefined
< prev  1681 to 1700 of 1922  next > 
Advertisements
Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×