English

HSC Arts (English Medium) 12th Standard Board Exam - Maharashtra State Board Question Bank Solutions

Advertisements
Subjects
Topics
Subjects
Popular subjects
Topics

Please select a subject first

Advertisements
Advertisements
< prev  7181 to 7200 of 9423  next > 

Solve the following L.P.P graphically:

Maximize: Z = 10x + 25y
Subject to: x ≤ 3, y ≤ 3, x + y ≤ 5, x ≥ 0, y ≥ 0

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

`int1/xlogxdx=...............`

(A)log(log x)+ c

(B) 1/2 (logx )2+c

(C) 2log x + c

(D) log x + c

[10] Indefinite Integration
Chapter: [10] Indefinite Integration
Concept: undefined >> undefined

Advertisements

Find the approximate value of ` sqrt8.95 `

[9] Applications of Derivatives
Chapter: [9] Applications of Derivatives
Concept: undefined >> undefined

If u and v are two functions of x then prove that

`intuvdx=uintvdx-int[du/dxintvdx]dx`

Hence evaluate, `int xe^xdx`

[10] Indefinite Integration
Chapter: [10] Indefinite Integration
Concept: undefined >> undefined

The time (in minutes) for a lab assistant to prepare the equipment for a certain experiment is a random variable taking values between 25 and 35 minutes with p.d.f 

`f(x) = {{:(1/10",", 25 ≤ x ≤ 35),(0",", "otherwise"):}`

What is the probability that preparation time exceeds 33 minutes? Also, find the c.d.f. of X.

[14] Probability Distributions
Chapter: [14] Probability Distributions
Concept: undefined >> undefined

Minimize :Z=6x+4y

Subject to : 3x+2y ≥12

x+y ≥5

0 ≤x ≤4

0 ≤ y ≤ 4 

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

Minimum and maximum z = 5x + 2y subject to the following constraints:

x-2y ≤ 2

3x+2y ≤ 12

-3x+2y ≤ 3

x ≥ 0,y ≥ 0

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

A manufacturer produces two products A and B. Both the products are processed on two different machines. The available capacity of first machine is 12 hours and that of second machine is 9 hours per day. Each unit of product A requires 3 hours on both machines and each unit of product B requires 2 hours on first machine and 1 hour on second machine. Each unit of product A is sold at Rs 7 profit and  B at a profit of Rs 4. Find the production level per day for maximum profit graphically.

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

A company manufactures bicycles and tricycles each of which must be processed through machines A and B. Machine A has maximum of 120 hours available and machine B has maximum of 180 hours available. Manufacturing a bicycle requires 6 hours on machine A and 3 hours on machine B. Manufacturing a tricycle requires 4 hours on machine A and 10 hours on machine B.
If profits are Rs. 180 for a bicycle and Rs. 220 for a tricycle, formulate and solve the L.P.P. to determine the number of bicycles and tricycles that should be manufactured in order to maximize the profit.

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

Find the approximate value of cos (60° 30').

(Given: 1° = 0.0175c, sin 60° = 0.8660)

[9] Applications of Derivatives
Chapter: [9] Applications of Derivatives
Concept: undefined >> undefined

Solve the following LPP by graphical method:

Maximize: z = 3x + 5y
Subject to: x + 4y ≤ 24
                  3x + y ≤ 21
                  x + y ≤ 9
                  x ≥ 0, y ≥ 0 

Also find the maximum value of z.

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

Find the shortest distance between the lines `(x+1)/7=(y+1)/(-6)=(z+1)/1 and (x-3)/1=(y-5)/(-2)=(z-7)/1`

[6] Line and Plane
Chapter: [6] Line and Plane
Concept: undefined >> undefined

Find the approximate value of log10 (1016), given that log10e = 0⋅4343.

[9] Applications of Derivatives
Chapter: [9] Applications of Derivatives
Concept: undefined >> undefined

Solve the following L. P. P. graphically:Linear Programming

Minimize Z = 6x + 2y

Subject to

5x + 9y ≤ 90

x + y ≥ 4

y ≤ 8

x ≥ 0, y ≥ 0

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

Prove that:

`int sqrt(x^2 + a^2)dx = x/2 sqrt(x^2 + a^2) + a^2/2 log |x + sqrt(x^2 + a^2)| + c`

[10] Indefinite Integration
Chapter: [10] Indefinite Integration
Concept: undefined >> undefined

Solve the following LPP by graphical method:

Minimize Z = 7x + y subject to 5x + y ≥ 5, x + y ≥ 3, x ≥ 0, y ≥ 0

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

The point at which the maximum value of x + y subject to the constraints x + 2y ≤ 70, 2x + y ≤ 95, x ≥ 0, y ≥ 0 is obtained, is ______.

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

The value of objective function is maximum under linear constraints ______.

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

 Maximize: z = 3x + 5y  Subject to

x +4y ≤ 24                3x + y  ≤ 21 

x + y ≤ 9                     x ≥ 0 , y ≥0

[7] Linear Programming
Chapter: [7] Linear Programming
Concept: undefined >> undefined

. Show that the lines represented by 3x2 - 4xy - 3y2 = 0 are perpendicular to each other.

[4] Pair of Straight Lines
Chapter: [4] Pair of Straight Lines
Concept: undefined >> undefined
< prev  7181 to 7200 of 9423  next > 
Advertisements
Advertisements
Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×