Choose the most appropriate option.

Two men and seven boys can do work in 14 days. Three men and eight boys can do the same work in 11 days. Further, eight men and six boys can do three times the amount of this work in:

विकल्प

  • 18 days

  • 21 days

  • 30 days

  • 24 days

MCQ
Advertisements

उत्तर

21 days

Explanation:

According to question

(2 × 14) men + (7 × 14) boys = (3 × 11) men + (8 × 11) boys

⇒ 5 men = 10 boys or 1 man = 2 boys

∴ (2 men + 7 boys) = (2 × 2 + 7) boys = 11 boys

(8 men + 6 boys) = (8 × 2 + 6) boys = 22 boys

Let the required number of days be x

According to the ratio proportion,

Boys 22: 11 Work 1: 3] :: 14 : x

∴ (22 × 1 × x) = (11 × 3 × 14)

`∴"x"=462/22=21`

Hence, the required number of days = 21.

shaalaa.com
Time and Work (Entrance Exam)
  क्या इस प्रश्न या उत्तर में कोई त्रुटि है?
2016-2017 (May) Set 1

संबंधित प्रश्न

Arun can climb a Coconut tree by 1.5 feet by each lift; however, he slips 0.5 feet every time he makes the next lift. How many individual lifts he will have to reach the top of the Coconut tree of 18.5 feet?


Choose the most appropriate option

‘A’ and ‘B’ complete a work in 12 days, ‘B’ and ‘C’ in 8 days and ‘C’ and ‘A’ in 16 days. ‘A’ left after working for 3 days. In how many days more will ‘B’ and ‘C’ finish the remaining work?


Solve the following question and mark the best possible option.
It takes 8 people working at equal rates to finish work in 96 days. How long will 6 workers take to finish the same work?


Twenty-five workers were employed to complete a compound wall in 12 days. Five workers left after working for 4 days. The remaining 20 workers completed the work. In how many days the total job was completed?


10 men can finish the construction of a hut in 8 days. How many men are needed to finish the same in half a day?


A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days?


Ram can do a work in 60 days and the same work Sohan can finish in 40 days. If both of them work together, then in how many days will the work be over?


A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:


Vikas can complete a job in 15 days. Babin can do the same job in 10 days. In how many days can they complete the job if they work together?


A. B and C together can complete a piece of work in 30 minutes. A and B together can complete the same work in 50 minutes. C alone can complete the work in ______.


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×