‘A’ and ‘B’ complete a work in 12 days, ‘B’ and ‘C’ in 8 days and ‘C’ and ‘A’ in 16 days. ‘A’ left after working for 3 days. In how many days more will ‘B’ and ‘C’ finish the remaining work?
विकल्प
`3 3/4`
`4 3/4`
`6 5/6`
`7 3/4`
Advertisements
उत्तर
`4 3/4`
Explanation:
A, B, and C together can do work in
`=(2xx12xx8xx16)/(12xx8+8xx16+16xx12)`
`=96/13` days
Work is done by all in 3 days`=13/96xx3=39/96`
∴ Remaining work`=1-39/96=57/96`, which is to done by B and C.
∴ B and C can do the remaining work in `57/96xx8`
∴`57/12=4 3/4` days.
APPEARS IN
संबंधित प्रश्न
Arun can climb a Coconut tree by 1.5 feet by each lift; however, he slips 0.5 feet every time he makes the next lift. How many individual lifts he will have to reach the top of the Coconut tree of 18.5 feet?
Solve the following question and mark the best possible option.
Four gardeners with four grass mowers can mow 400 square meters of ground in four hours. How long would it take for eight gardeners with eight grass mowers to mow 800 square meters of the ground?
16 men can do a piece of work in 16 days. 4 days after they started the work 8 more men joined them. How many days will they now take to complete the remaining work?
A group of workers accepted to do a piece of work in 25 days. If 6 of them did not turn up for the work and the remaining workers did the work in 40 days, then the original number of workers was
A and B can do a piece of work in 6 and 12 days, respectively. They (both) will complete the work in how many days?
A water tank has three taps A, B and C. A fills four buckets in 24 minutes, B fills 8 buckets in 1 hour and C fills 2 buckets in 20 minutes. If all the taps are opened together a full tank is emptied in 2 hours. If a bucket can hold 5 litres of water what is the capacity of the tank?
A does 80% of work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?
A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for ₹ 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?
Ram can do a work in 60 days and the same work Sohan can finish in 40 days. If both of them work together, then in how many days will the work be over?
Two men A and B, each working alone by working 12 hours per day, can complete a work in 20 days. For execution of the work, it was decided that A and B would be working for 8 and 6 hours per day, respectively, on alternate days starting with A. If it takes x days and y hours to complete the work then (x, y) is: