प्रश्न
Choose the most appropriate option
‘A’ and ‘B’ complete a work in 12 days, ‘B’ and ‘C’ in 8 days and ‘C’ and ‘A’ in 16 days. ‘A’ left after working for 3 days. In how many days more will ‘B’ and ‘C’ finish the remaining work?
पर्याय
`3 3/4`
`4 3/4`
`6 5/6`
`7 3/4`
Advertisements
उत्तर
`4 3/4`
Explanation:
A, B, and C together can do work in
`=(2xx12xx8xx16)/(12xx8+8xx16+16xx12)`
`=96/13` days
Work is done by all in 3 days`=13/96xx3=39/96`
∴ Remaining work`=1-39/96=57/96`, which is to done by B and C.
∴ B and C can do the remaining work in `57/96xx8`
∴`57/12=4 3/4` days.
APPEARS IN
संबंधित प्रश्न
A tank is connected to three pipes – Pipe A, B, and C. Pipe A can fill the tank in 6 hours, B can fill the tank in 8 hours and Pipe C can empty the full tank in 12 hours. How much time will it take to fill the tank completely if all three pipes are working together?
Solve the following question and mark the best possible option.
It takes 8 people working at equal rates to finish work in 96 days. How long will 6 workers take to finish the same work?
A can do a piece of work in 20 days and B can do the same work in 15 days. How long will they take to finish the work, if both work together?
In a call center, 6 employees working for 10 hours complete a certain task. They started working at 11:00 a.m. This continued till 5.00 pm and after that, for each hour one more employee is added till the work gets completed. At what time will they complete the work?
Aarti can do a piece of work in 6 days. In how many days will she complete three times of work of the same type?
A water tank has three taps A, B and C. A fills four buckets in 24 minutes, B fills 8 buckets in 1 hour and C fills 2 buckets in 20 minutes. If all the taps are opened together a full tank is emptied in 2 hours. If a bucket can hold 5 litres of water what is the capacity of the tank?
Twenty women can do a piece of work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman?
Two pipes P and Q can fill a tank in 15 min and 20 min, respectively. Both the pipes are opened together but after 4 min, pipe P is turned off. What is the total time required to fill the tank?
A. B and C together can complete a piece of work in 30 minutes. A and B together can complete the same work in 50 minutes. C alone can complete the work in ______.
26 men can complete a piece of work in 17 days. How many more men must be hired to complete the work in 13 days?