Advertisements
Advertisements
प्रश्न
Choose the most appropriate option
‘A’ and ‘B’ complete a work in 12 days, ‘B’ and ‘C’ in 8 days and ‘C’ and ‘A’ in 16 days. ‘A’ left after working for 3 days. In how many days more will ‘B’ and ‘C’ finish the remaining work?
पर्याय
`3 3/4`
`4 3/4`
`6 5/6`
`7 3/4`
Advertisements
उत्तर
`4 3/4`
Explanation:
A, B, and C together can do work in
`=(2xx12xx8xx16)/(12xx8+8xx16+16xx12)`
`=96/13` days
Work is done by all in 3 days`=13/96xx3=39/96`
∴ Remaining work`=1-39/96=57/96`, which is to done by B and C.
∴ B and C can do the remaining work in `57/96xx8`
∴`57/12=4 3/4` days.
APPEARS IN
संबंधित प्रश्न
Arun can climb a Coconut tree by 1.5 feet by each lift; however, he slips 0.5 feet every time he makes the next lift. How many individual lifts he will have to reach the top of the Coconut tree of 18.5 feet?
Madhu takes twice as much time as Uma to complete work and Ramesh does it in the same time as Madhu and Umatogether. If all three working together can finish the work in 6 days, then the time taken by Madhu to finish the work is
Solve the following question and mark the best possible option.
It takes 8 people working at equal rates to finish work in 96 days. How long will 6 workers take to finish the same work?
Twenty-five workers were employed to complete a compound wall in 12 days. Five workers left after working for 4 days. The remaining 20 workers completed the work. In how many days the total job was completed?
16 men can do a piece of work in 16 days. 4 days after they started the work 8 more men joined them. How many days will they now take to complete the remaining work?
A contractor Abhay Singh employed some men to do a piece of work which can be done by 16 men in 14 days. At the end of 5 days, 7 of the men stopped working and 3 days later half of the remainder stopped working; the rest finished the work in 5 days. What is the number of men originally employed?
Two pipes P and Q can fill a tank in 15 min and 20 min, respectively. Both the pipes are opened together but after 4 min, pipe P is turned off. What is the total time required to fill the tank?
8 boys and 12 girls together can finish a project work in 5 days. If it takes 50 days for one boy alone to finish the same project, how many days are required for one girl alone to complete the same project work?
A can do a work in 6 days and B in 9 days. How many days wlll both take together to complete the work?
Anil can do a job in 10 days. Sunn is 40% more efficient than Anil. Find the no. of days required by Sunil to do the same job.
