Choose the most appropriate option.

Two men and seven boys can do work in 14 days. Three men and eight boys can do the same work in 11 days. Further, eight men and six boys can do three times the amount of this work in:

पर्याय

  • 18 days

  • 21 days

  • 30 days

  • 24 days

MCQ
Advertisements

उत्तर

21 days

Explanation:

According to question

(2 × 14) men + (7 × 14) boys = (3 × 11) men + (8 × 11) boys

⇒ 5 men = 10 boys or 1 man = 2 boys

∴ (2 men + 7 boys) = (2 × 2 + 7) boys = 11 boys

(8 men + 6 boys) = (8 × 2 + 6) boys = 22 boys

Let the required number of days be x

According to the ratio proportion,

Boys 22: 11 Work 1: 3] :: 14 : x

∴ (22 × 1 × x) = (11 × 3 × 14)

`∴"x"=462/22=21`

Hence, the required number of days = 21.

shaalaa.com
Time and Work (Entrance Exam)
  या प्रश्नात किंवा उत्तरात काही त्रुटी आहे का?
2016-2017 (May) Set 1

संबंधित प्रश्‍न

Arun can climb a Coconut tree by 1.5 feet by each lift; however, he slips 0.5 feet every time he makes the next lift. How many individual lifts he will have to reach the top of the Coconut tree of 18.5 feet?


Madhu takes twice as much time as Uma to complete work and Ramesh does it in the same time as Madhu and Umatogether. If all three working together can finish the work in 6 days, then the time taken by Madhu to finish the work is


Choose the most appropriate option.

A can do a piece of work in 8 days and B alone can do the same work in 10 days. A and B agreed to do the work together for Rs. 720. With the help of C, they finished the work in 4 days. How much C is to be paid?


Solve the following question and mark the best possible option.
Four gardeners with four grass mowers can mow 400 square meters of ground in four hours. How long would it take for eight gardeners with eight grass mowers to mow 800 square meters of the ground?


A contractor Abhay Singh employed some men to do a piece of work which can be done by 16 men in 14 days. At the end of 5 days, 7 of the men stopped working and 3 days later half of the remainder stopped working; the rest finished the work in 5 days. What is the number of men originally employed?


A group of men decided to do a job in 8 days. But since 10 men dropped out every day, the job got completed at the end of the 12th day. How many men were there at the beginning?


A and B can do a piece of work in 6 and 12 days, respectively. They (both) will complete the work in how many days?


A, B, and C get  ₹5400 for doing work in 36 days. A and C get ₹1880 for doing the same work in 20 days, which B and C get ₹3040 for doing the same work in 40 days. Find the amount received by C per day.


Pipes P and Q can fill a tank in 5 and 6 h respectively. Pipe R can empty it in 12 h. If all the three pipes are opened together, then the tank will be filled in :


8 boys and 12 girls together can finish a project work in 5 days. If it takes 50 days for one boy alone to finish the same project, how many days are required for one girl alone to complete the same project work?


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×