Advertisements
Advertisements
Question
Time taken by a construction company to construct a flyover is a normal variate with mean 400 labour days and a standard deviation of 100 labour days. If the company promises to construct the flyover in 450 days or less and agree to pay a penalty of ₹ 10,000 for each labour day spent in excess of 450. What is the probability that the company pay a penalty of at least ₹ 2,00,000?
Advertisements
Solution
Let x be a normal variate with mean 400 labour days and standard deviation of 100 labour days
m = 400 and σ = 100
The construction work should be completed within 450 days.
The standard normal variate
= `(x - mu)/6 = (x - 400)/100`
Personality for 1 labour day = ₹ 10,000
If personality amount is = 2,00,000 than No of excess

Days = `200000/10000` = 20
∴ x = 450 + 20 = 470
When x = 470
z = `(470 - 400)/100 = 70/100` = 0.7
= P(X ≥ 470) = P(Z ≥ 0.7)
= 0.5 – 0.2580
= 0.2420
APPEARS IN
RELATED QUESTIONS
Write down the condition for which the binomial distribution can be used.
It is given that 5% of the electric bulbs manufactured by a company are defective. Using poisson distribution find the probability that a sample of 120 bulbs will contain no defective bulb
A car hiring firm has two cars. The demand for cars on each day is distributed as a Posison variate, with mean 1.5. Calculate the proportion of days on which some demand is refused
Assuming that a fatal accident in a factory during the year is 1/1200, calculate the probability that in a factory employing 300 workers there will be at least two fatal accidents in a year, (given e-0.25 = 0.7788).
In a test on 2,000 electric bulbs, it was found that bulbs of a particular make, was normally distributed with an average life of 2,040 hours and standard deviation of 60 hours. Estimate the number of bulbs likely to burn for less than 1,950 hours
Choose the correct alternative:
If X ~ N(9, 81) the standard normal variate Z will be
Choose the correct alternative:
If Z is a standard normal variate, the proportion of items lying between Z = – 0.5 and Z = – 3.0 is
Choose the correct alternative:
In a binomial distribution, the probability of success is twice as that of failure. Then out of 4 trials, the probability of no success is
A manufacturer of metal pistons finds that on the average, 12% of his pistons are rejected because they are either oversize or undersize. What is the probability that a batch of 10 pistons will contain no more than 2 rejects?
The annual salaries of employees in a large company are approximately normally distributed with a mean of $50,000 and a standard deviation of $20,000. What percent of people earn between $45,000 and $65,000?
