Time taken by a construction company to construct a flyover is a normal variate with mean 400 labour days and a standard deviation of 100 labour days. If the company promises to construct the flyover in 450 days or less and agree to pay a penalty of ₹ 10,000 for each labour day spent in excess of 450. What is the probability that the company pay a penalty of at least ₹ 2,00,000?
Advertisements
उत्तर
Let x be a normal variate with mean 400 labour days and standard deviation of 100 labour days
m = 400 and σ = 100
The construction work should be completed within 450 days.
The standard normal variate
= `(x - mu)/6 = (x - 400)/100`
Personality for 1 labour day = ₹ 10,000
If personality amount is = 2,00,000 than No of excess

Days = `200000/10000` = 20
∴ x = 450 + 20 = 470
When x = 470
z = `(470 - 400)/100 = 70/100` = 0.7
= P(X ≥ 470) = P(Z ≥ 0.7)
= 0.5 – 0.2580
= 0.2420
APPEARS IN
संबंधित प्रश्न
If 18% of the bolts produced by a machine are defective, determine the probability that out of the 4 bolts chosen at random none will be defective
An experiment succeeds twice as often as it fails, what is the probability that in next five trials there will be at least three successes
Define Standard normal variate
Write down the conditions in which the Normal distribution is a limiting case of binomial distribution
Choose the correct alternative:
If Z is a standard normal variate, the proportion of items lying between Z = – 0.5 and Z = – 3.0 is
Choose the correct alternative:
The parameters of the normal distribution f(x) = `(1/sqrt(72pi))"e"^(-(x - 10)^2)/72 - oo < x < oo`
Choose the correct alternative:
The average percentage of failure in a certain examination is 40. The probability that out of a group of 6 candidates atleast 4 passed in the examination are
Choose the correct alternative:
The time until the first failure of a brand of inkjet printers is normally distributed with a mean of 1,500 hours and a standard deviation of 200 hours. What proportion of printers fails before 1000 hours?
Choose the correct alternative:
If the area to the left of a value of z (z has a standard normal distribution) is 0.0793, what is the value of z?
Choose the correct alternative:
If P(Z > z) = 0.8508 what is the value of z (z has a standard normal distribution)?