Fifteen men can build a wall in 60 days. How many more men are required to build another wall of the same size in 45 days?
Advertisements
Solution
In 60 days a wall can be built by = 15 men
In 1 day a wall can be built by = 15 x 60 men
In 45 days a wall can be built by = `(15xx60)/45=900/45` = 20 men
No. of more men required to build the wall in 45 days = 20 – 15 = 5 men
APPEARS IN
RELATED QUESTIONS
A particular work can be completed by 6 men and 6 women in 24 days; whereas the same work can be completed by 8 men and 12 women in 15 days. Find :
(i) according to the amount of work done, one man is equivalent to how many women.
(ii) the time is taken by 4 men and 6 women to complete the same work.
Six taps can fill an empty cistern in 8 hours. How much more time will be taken, if two taps go out of order? Assume, all the taps supply water at the same rate.
If 10 horses consume 18 bushels in 36 days. How long will 24 bushels last for 30 horses?
A contractor undertakes to build a wall 1000 m long in 50 days. He employs 56 men, but at the end of 27 days, he finds that only 448 m of wall is built. How many extra men must the contractor employ so that the wall is completed in time?
The price of 25 identical articles is ₹1,750. Find the price of 13 articles
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 15 soaps?
Cost of 10 kg of wheat is ₹ 180. What quantity of wheat can be purchased in ₹ 432?
A truck requires 108 litres of diesel for covering a distance of 1188 km. How much diesel will be required by the truck to cover a distance of 3300 km?
Once the value of a single unit is known, which operation is used to find the value of "many" units?
30 identical articles weigh 360 g. How many articles will weigh 840 g?