English

A coolie A takes 1 minute to lift a load to the roof of a bus, whereas coolie B takes 2 minutes to lift the same load to the roof of the same bus. The work done by B is ______.

Advertisements
Advertisements

Question

A coolie A takes 1 minute to lift a load to the roof of a bus, whereas coolie B takes 2 minutes to lift the same load to the roof of the same bus. The work done by B is ______.

Options

  • equal to work done by A.

  • greater than work done by A.

  • less than work done by A.

  • none of the above.

MCQ
Advertisements

Solution

A coolie A takes 1 minute to lift a load to the roof of a bus, whereas coolie B takes 2 minutes to lift the same load to the roof of the same bus. The work done by B is equal to work done by A.

Explanation:

Work done in lifting a load depends only on the force and the vertical displacement, not on time. Both coolies lift the same load to the same height, so the work done by B is equal to that done by A. Time affects power, not work.

shaalaa.com
  Is there an error in this question or solution?
Chapter 2: Work, Energy and Power - EXERCISE - 2(A) [Page 30]

APPEARS IN

Selina Concise Physics [English] Class 10 ICSE
Chapter 2 Work, Energy and Power
EXERCISE - 2(A) | Q (A) 4. | Page 30
Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×