A Block of Mass 30 Kg is Pulled up a Slope, as Shown in Diagram with a Constant Speed, by Applying a Force of 200 N Parallel to Slope. a and B Are Initial and Final Positions of Block.
Advertisements
प्रश्न
A block of mass 30 kg is pulled up a slope, as shown in diagram with a constant speed, by applying a force of 200 N parallel to slope.
A and B are initial and final positions of block.

(i) Calculate the work done by force in moving the block from A to B.
(ii) Calculate P.E. gained by block. [g=10ms-2]
Advertisements
उत्तर
(i) Work done in moving the block from = F × d
A to B = 200 N × 3m = 600 J
(ii) Gain in potential energy = mgh = 30 × 10 × 1.5 = 450 J.
संबंधित प्रश्न
Derive a relationship between S.I. and C.C.S. unit of work
A bullet of mass 0.5 kg slows down from a speed of 5 m s-1 to that of 3 m s-1. Calculate the change in kinetic energy of the ball.
Each of the following statement describes a force acting. Which force is causing work to be done?
Draw a neat labeled diagram to show the direction of two forces acting on a body to produce rotation in it. Also mark the point about which rotation takes place.
Calculate the amount of work done by a child carrying a bag of 20 kg when he moves a distance of 40 m in
(a) Vertical direction, and
(b) Horizontal direction
Name the material commonly used for the manufacturing of solar cells.
How long should an electric motor, of power 2 H.P. operate, so as to pump 5 m3 of water from a depth of 15m. [Take g = 10 N kg−1]
A car is accelerated on a levelled road and attains a velocity 4 times of its initial velocity. In this process the potential energy of the car
