Advertisements
Advertisements
प्रश्न
A block of mass 30 kg is pulled up a slope, as shown in diagram with a constant speed, by applying a force of 200 N parallel to slope.
A and B are initial and final positions of block.

(i) Calculate the work done by force in moving the block from A to B.
(ii) Calculate P.E. gained by block. [g=10ms-2]
Advertisements
उत्तर
(i) Work done in moving the block from = F × d
A to B = 200 N × 3m = 600 J
(ii) Gain in potential energy = mgh = 30 × 10 × 1.5 = 450 J.
APPEARS IN
संबंधित प्रश्न
State the S.I. unit of work and define it.
State two advantage of producing hydroelectricity.
Define 1 joule of work.
If the work done by a force in moving an object through a distance of 20 cm is 24.2 J, what is the magnitude of the force?
Why does a spanner have a long handle?
A man climbs a slope and another walks same distance on level road. Which of the two expends more energy and why?
Calculate the work done when:
A 5 kg weight is lifted 10 m vertically. (g = 9.8 m/s2)
Write the two main conditions are needed for work to be done?
