प्रश्न
Six men can complete a work in 12 days. Two days later, 6 more men joined them. How many days will they take to complete the remaining work?
Advertisements
उत्तर
| Number of men | No. of days | |
| Initially | 6 | 12 |
| 2 days later available work | 6 | 12 − 2 = 10 |
| Remaining work after 6 men joined | 6 + 6 = 12 | x |
As the number of men increases the number of days decreases.
∴ They are inversely proportional
x1y1 = x2y2
6 × 10 = 12 × x
x = `(6 xx 10)/12`
x = 5 days
∴ Remaining work will be complete in 5 days
APPEARS IN
संबंधित प्रश्न
A farmer has enough food to feed 20 animals in his cattle for 6 days. How long would the food last if there were 10 more animals in his cattle?
A batch of bottles was packed in 25 boxes with 12 bottles in each box. If the same batch is packed using 20 bottles in each box, how many boxes would be filled?

Which of the following quantities vary inversely as other?
The number of x men hired to construct a wall and the time y taken to finish the job.
A work force of 50 men with a contractor can finish a piece of work in 5 months. In how many months the same work can be completed by 125 men?
A group of 3 friends staying together, consume 54 kg of wheat every month. Some more friends join this group and they find that the same amount of wheat lasts for 18 days. How many new members are there in this group now?
Five workers take 12 days to weed a field. How many days would 6 workers take? How many would 15 take?
If 40 workers can do a project work in 8 days, then _________ workers can do it in 4 days
12 cows can graze a field for 10 days. 20 cows can graze the same field for _______ days
Write whether the following statement vary directly, vary inversely with each other, or neither of the two.
The height of a tree and the number of years.
The variable x is inversely proportional to y. If x increases by p%, then by what per cent will y decrease?