Advertisements
Advertisements
प्रश्न
If 12 men and 16 boys can do a piece of work in 5 days and, 13 men and 24 boys can do it in 4 days, how long will 7 men and 10 boys take to do it?
Advertisements
उत्तर
12 men + 16 boys can do a piece of work in = 5 days
60 men + 80 boys can do a piece of work in = 1 day ......…. (i)
and 13 men + 24 boys can do the same work in = 4 days
52 men + 96 boys can do the same work in = 1 day ………….(ii)
From (i) and (ii)
60 men + 80 boys = 52 men + 96 boys
⇒ 60 men – 52 men = 96 boys – 80 boys
⇒ 8 men = 16 boys
1 man =`16/8` = boys
Now, in first case,
12 men + 16 boys = 12 x 2 + 16 = 24+16 = 40 boys
In the second case,
7 men + 10 boys = 7 x 2 + 10 = 14 + 10 = 24 boys
Now 40 boys can do a piece of work in = 5 days
1 boy can do the same work in = 5 x 40 days
and 24 boys will do the same work in
`=(5xx40)/24` days
`=25/3`
`=8 1/3` days
APPEARS IN
संबंधित प्रश्न
`3/5` quintal of wheat costs Rs.210. Find the cost of :
(i) 1 quintal of wheat
(ii) 0.4 quintal of wheat
Six taps can fill an empty cistern in 8 hours. How much more time will be taken, if two taps go out of order? Assume, all the taps supply water at the same rate.
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
A car covers a distance of 180 km in 5 hours. How much time will the car take to cover 54 km with the same speed?
Cost of 10 kg of wheat is ₹ 180. What quantity of wheat can be purchased in ₹ 432?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
25 metres of cloth costs ₹ 1,012.50. What will be the cost of 20 metres of cloth of the same type?
In a particular week, a man works for 48 hours and earns ₹ 4,320. But in the next week he worked 6 hours less, how much has he earned in this week?
30 identical articles weigh 360 g. How many articles will weigh 840 g?
