प्रश्न
A work force of 50 men with a contractor can finish a piece of work in 5 months. In how many months the same work can be completed by 125 men?
Advertisements
उत्तर
Let x be the number days required to complete a piece of work by 125 men.
| Number of men | 50 | 125 |
| Months | 5 | x |
\[\text{ Since the number of men engaged and the number of days taken to do a piece of work are in inverse variation, we have: } \]
\[ 50 \times 5 = 125x\]
\[ \Rightarrow x = \frac{50 \times 5}{125}\]
\[ = 2\]
\[\text{ Thus, the required number of months is 2 } .\]
APPEARS IN
संबंधित प्रश्न
If a box of sweets is divided among 24 children, they will get 5 sweets each. How many would each get, if the number of the children is reduced by 4?
Which of the following quantities vary inversely as other?
Journey (x km) undertaken by a car and the petrol (y litres) consumed by it.
If 36 men can do a piece of work in 25 days, in how many days will 15 men do it?
In a hostel of 50 girls, there are food provisions for 40 days. If 30 more girls join the hostel, how long will these provisions last?
A farmer has enough food for 144 ducks for 28 days. If he sells 32 ducks how long will the food last?
It takes 120 minutes to weed a garden with 6 gardeners. If the same work is to be done in 30 minutes, how many more gardeners are needed?
Neelaveni goes by bicycle to her school every day. Her average speed is 12 km/hr and she reaches school in 20 minutes. What is the increase in speed, If she reaches the school in 15 minutes?
Which of the following vary inversely with each other?
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
| a | l | 9 | n | 6 |
| b | 5 | m | 25 | 10 |