A tank is connected to three pipes – Pipe A, B, and C. Pipe A can fill the tank in 6 hours, B can fill the tank in 8 hours and Pipe C can empty the full tank in 12 hours. How much time will it take to fill the tank completely if all three pipes are working together?
विकल्प
4 hours
4 hours 48 minutes
5 hours
5 hours 20 minutes
Advertisements
उत्तर
4 hours 48 minutes
Explanation:
A portion of a tank filled in 1 hour, when pipe A, B, and C are working together
`=1/6+1/8-1/12`
`=(4+3-2)/24=5/24` tank
Hence, the time required to fill the tank`=24/5` hours
= 4.8 hours
= 4 hours 48 minutes.
APPEARS IN
संबंधित प्रश्न
10 men can finish the construction of a hut in 8 days. How many men are needed to finish the same in half a day?
16 men can do a piece of work in 16 days. 4 days after they started the work 8 more men joined them. How many days will they now take to complete the remaining work?
A group of workers accepted to do a piece of work in 25 days. If 6 of them did not turn up for the work and the remaining workers did the work in 40 days, then the original number of workers was
A water tank has eight pipes fitted into it. Pipes are of two types: Green Pipe and Red Pipe. Green pipes are used to fill the tank and the Red pipes are used to empty the tank. Every Green pipe can fill the tank in 12 hours and every Red pipe can empty it in 36 hours. On opening all the pipes an empty tank is filled in 3 hours. The number of Red pipe is
Aarti can do a piece of work in 6 days. In how many days will she complete three times of work of the same type?
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same work in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be
A and B can together finish work in 30 days. They worked together for 20 days and then B left. After another 20 days, A finished the remaining work. In how many days, A alone can finish the work?
P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?
8 boys and 12 girls together can finish a project work in 5 days. If it takes 50 days for one boy alone to finish the same project, how many days are required for one girl alone to complete the same project work?
8 men can finish half of the work in 3 days. If the remaining work is to be completed in 2 days. then the no. of additional men required are?