मराठी

A Tank is Connected to Three Pipes – Pipe A, B, and C. Pipe a Can Fill the Tank in 6 Hours, B Can Fill the Tank in 8 Hours and Pipe C Can Empty the Full Tank in 12 Hours. How Much Time

Advertisements
Advertisements

प्रश्न

A tank is connected to three pipes – Pipe A, B, and C. Pipe A can fill the tank in 6 hours,  B can fill the tank in 8 hours and Pipe C can empty the full tank in 12 hours. How much time will it take to fill the tank completely if all three pipes are working together? 

पर्याय

  • 4 hours 

  • 4 hours 48 minutes

  • 5 hours

  • 5 hours 20 minutes

MCQ
Advertisements

उत्तर

4 hours 48 minutes

Explanation:

A portion of a tank filled in 1 hour, when pipe A, B, and C are working together

`=1/6+1/8-1/12`

`=(4+3-2)/24=5/24` tank

Hence, the time required to fill the tank`=24/5` hours

= 4.8 hours

= 4 hours 48 minutes.

shaalaa.com
Time and Work (Entrance Exam)
  या प्रश्नात किंवा उत्तरात काही त्रुटी आहे का?
2018-2019 (May) Set 1

संबंधित प्रश्‍न

Choose the most appropriate option

‘A’ and ‘B’ complete a work in 12 days, ‘B’ and ‘C’ in 8 days and ‘C’ and ‘A’ in 16 days. ‘A’ left after working for 3 days. In how many days more will ‘B’ and ‘C’ finish the remaining work?


Solve the following question and mark the best possible option.
A tank can be filled up by two pipes A and B in 2 hours and 3 hours respectively. A third pipe C can empty the full tank in 6hours. If all the taps can be turned on at the same time, the tank will be full in:


16 men can do a piece of work in 16 days. 4 days after they started the work 8 more men joined them. How many days will they now take to complete the remaining work?


Aarti can do a piece of work in 6 days. In how many days will she complete three times of work of the same type?


A, B, and C get  ₹5400 for doing work in 36 days. A and C get ₹1880 for doing the same work in 20 days, which B and C get ₹3040 for doing the same work in 40 days. Find the amount received by C per day.


A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:


A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in:


8 boys and 12 girls together can finish a project work in 5 days. If it takes 50 days for one boy alone to finish the same project, how many days are required for one girl alone to complete the same project work?


Kiran can complete a task in 15 days. He works for 5 days and then leaves. If Venkat completes the remaining task in 30 days, then in how many days can Venkat alone complete the same task?


Five men can complete a piece of work in 24 days. In how many days will 12 men complete the same piece of work?


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×