Advertisements
Advertisements
प्रश्न
50 labourers can dig a pond in 16 days. How many labourers will be required to dig another pond, double in size in 20 days?
Advertisements
उत्तर
In 16 days for diging pond labour reqd.
In 1 day, labour reqd. = 50 × 16
In 20 days, labour reqd. = `(50xx16)/20`
In 20 days, with double work, labour reqd.
`=(50xx16xx2)/20`
= 5 × 8 × 2
= 80
Hence labourers required = 80
APPEARS IN
संबंधित प्रश्न
Eight oranges can be bought for Rs. 10.40. How many more can be bought for Rs.16.90?
Ten men, working for 6 days of 10 hours each, finish `5/21` of a piece of work. How many men working at the same rate and for the same number of hours each day, will be required to complete the remaining work in 8 days?
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in one litre of petrol?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 3 dozen soaps?
For ₹ 378, 9 cans of juice can be bought, then how many cans of juice can be bought for ₹ 504?
If the cost of a dozen identical articles is ₹ 672, what will be the cost of 18 such articles?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
Weight of 15 books is 6 kg. What is the weight of 45 such books?
A made 84 runs in 6 overs and B made 126 runs in 7 overs. Who made more runs per over?
In the unitary method, which mathematical operation is used to convert the value of "many" units to the value of "one" unit?
