Advertisements
Advertisements
प्रश्न
50 labourers can dig a pond in 16 days. How many labourers will be required to dig another pond, double in size in 20 days?
Advertisements
उत्तर
In 16 days for diging pond labour reqd.
In 1 day, labour reqd. = 50 × 16
In 20 days, labour reqd. = `(50xx16)/20`
In 20 days, with double work, labour reqd.
`=(50xx16xx2)/20`
= 5 × 8 × 2
= 80
Hence labourers required = 80
APPEARS IN
संबंधित प्रश्न
`3/5` quintal of wheat costs Rs.210. Find the cost of :
(i) 1 quintal of wheat
(ii) 0.4 quintal of wheat
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
One tap can fill a cistern in 3 hours and the waste pipe can empty the full cistern in 5 hours. In what time will the empty cistern be full, if the tap and the waste pipe are kept open together?
The price of 25 identical articles is ₹1,750. Find the price of 13 articles
If the cost of 8 cans of juice is ₹ 280, then what will be the cost of 6 cans of juice?
If it has rained 276 cm in the last 3 days, how many cm of rain will fall in one week (7 days)?
Assume that the rain continues to fall at the same rate.
Cost of 10 kg of wheat is ₹ 180. What is the cost of 18 kg of wheat?
Geeta types 108 words in 6 minutes. How many words would she type in half an hour?
If John walks 250 steps to cover a distance of 200 metres, find the distance covered by him in 350 steps
30 identical articles weigh 360 g. How many articles will weigh 840 g?
