Advertisements
Advertisements
प्रश्न
A work-force of 420 men with a contractor can finish a certain piece of work in 9 months. How many extra men must he employ to complete the job in 7 months?
Advertisements
उत्तर
Let x be the extra number of men employed to complete the job in 7 months.
| Number of men | 420 | x |
| Months | 9 | 7 |
\[\text{ Since the number of men hired and the time required to finish the piece of work are in inverse variation, we have } : \]
\[420 \times 9 = 7x\]
\[ \Rightarrow x = \frac{420 \times 9}{7}\]
\[ = 540\]
\[\text{ Thus, the number of extra men required to complete the job in 7 months } = 540 - 420 = 120\]
APPEARS IN
संबंधित प्रश्न
It x and y vary inversely, fill in the following blank:
| x | 16 | 32 | 8 | 128 |
| y | 4 | ... | ... | 0.25 |
18 men can reap a field in 35 days. For reaping the same field in 15 days, how many men are required?
A person has money to buy 25 cycles worth Rs 500 each. How many cycles he will be able to buy if each cycle is costing Rs 125 more?
It takes 60 days for 10 machines to dig a hole. Assuming that all machines work at the same speed, how long will it take 30 machines to dig the same hole?
12 cows can graze a field for 10 days. 20 cows can graze the same field for _______ days
Both x and y are said to vary ______ with each other if for some positive number k, xy = k.
When the speed is kept fixed, time and distance vary inversely with each other.
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
| a | 6 | 8 | q | 25 |
| b | 18 | p | 39 | r |
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
| a | l | 9 | n | 6 |
| b | 5 | m | 25 | 10 |
At a particular time, the length of the shadow of Qutub Minar whose height is 72 m is 80 m. What will be the height of an electric pole, the length of whose shadow at the same time is 1000 cm?
