प्रश्न
A work-force of 420 men with a contractor can finish a certain piece of work in 9 months. How many extra men must he employ to complete the job in 7 months?
Advertisements
उत्तर
Let x be the extra number of men employed to complete the job in 7 months.
| Number of men | 420 | x |
| Months | 9 | 7 |
\[\text{ Since the number of men hired and the time required to finish the piece of work are in inverse variation, we have } : \]
\[420 \times 9 = 7x\]
\[ \Rightarrow x = \frac{420 \times 9}{7}\]
\[ = 540\]
\[\text{ Thus, the number of extra men required to complete the job in 7 months } = 540 - 420 = 120\]
APPEARS IN
संबंधित प्रश्न
Which of the following are in inverse proportion?
Area of cultivated land and the crop harvested
A batch of bottles was packed in 25 boxes with 12 bottles in each box. If the same batch is packed using 20 bottles in each box, how many boxes would be filled?

In a hostel of 50 girls, there are food provisions for 40 days. If 30 more girls join the hostel, how long will these provisions last?
If x and y vary inversely as other and x = 30, find y when constant of variation = 900.
Forty students stay in a hostel. They had food stock for 30 days. If the students are doubled then for how many days the stock will last?
4 typists are employed to complete a work in 12 days. If two more typists are added, they will finish the same work in _________ days
If x and y are in inverse proportion, then (x + 1) and (y + 1) are also in inverse proportion.
Write whether the following statement vary directly, vary inversely with each other, or neither of the two.
The height of a tree and the number of years.
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
| a | 6 | 8 | q | 25 |
| b | 18 | p | 39 | r |
At a particular time, the length of the shadow of Qutub Minar whose height is 72 m is 80 m. What will be the height of an electric pole, the length of whose shadow at the same time is 1000 cm?