Advertisements
Advertisements
प्रश्न
A truck driver can load oil drums into the back of the truck by pushing them up a sloping plank, or by lifting them directly. Each drum has a mass of 80 kg, the plank is 3 m long, and the back of the truck is 0.8 m above the ground.

(i) How much force would be needed to lift a drum into the truck directly/without using the plank? (Take g = 10 m/s2)
(ii) How much energy would be required in lifting the drum into the truck without the plank?
(iii) If the force needed to push the drum up the plank is 300 N, why is this less than the answer to part (i)?
(iv) When the truck is loaded, the driver drives off. List the major energy changes that take place in moving the truck.
(v) The driver has to stop at the factory gates. What happens to the kinetic energy of the truck?
Advertisements
उत्तर

(i) F = mg = 80 × 10 = 800 N.
(ii) Energy = m × g × h = 80 × 10 × 0.8 = 640 J.
(iii) In this case F = mg sin θ = `800xx0.8/3=640/3` = 213.3 N.
It is less than the answer in part (i) as the efforts act through 3 m whereas the weight is lifted up through 0.8 m. The effort needed maybe 300 N instead of 213.3 N owing to loss of energy in overcoming friction and air resistance.
(iv) The energy released owing to the combustion of fuel changes into kinetic energy of the truck and load, and these changes in heat energy of the pebbles on the road and of wheels.
(v) The kinetic energy is dissipated as heat.
संबंधित प्रश्न
An object thrown at a certain angle to the ground moves in a curved path and falls back to the ground. The initial and the final points of the path of the object lie on the same horizontal line. What is the work done by the force of gravity on the object?
When is work said to be done by a force?
Its moment of a force scalar or a vector quantity?
Name the physical quantity whose SI unit is Nm.
Give an example
Electrical energy changes of sound energy.
The work done by the heart is 1 Joule per beat. Calculate the power of the heart if it beats 72 times in one
A body of mass 0.5 kg travels on straight line path with velocity v = (3x2 + 4) m/s. The net work done by the force during its displacement from x = 0 tox = 2 m is ______.
