Advertisements
Advertisements
प्रश्न
Advertisements
उत्तर
K.E, K = `1/2 mv²
if speed is incresed four times
K.E,K' = `1/2` m(4v)²
or K' = 16 x `1/2` mv² = 16K
thus K.E becomes sisxteen times
APPEARS IN
संबंधित प्रश्न
Define the term energy.
.A man raises a box of mass 50kg to a height of 2m in 20s, while another man raises the same box to the same height in 50s. Compare:
(i) the work done, and
(ii) the power developed by them.
Define 1 joule of work.
What is the work done against gravity when a body is moved horizontally along a frictionless surface?
What are the quantities on which the amount of work done depends? How are they related to work?
When is the work done by a force on a body : (a) positive, (b) negative, and (c) zero?
A max X goes to the top of a building by a vertical spiral staircase. Another man Y of the same mass goes to the top of the same building by a slanting ladder. Which of the two does more work against gravity and why?
Is work done a scalar or a vector physical quantity?
________ is said to be done when a force is acting on it.
Look at the activity below. Reason out whether or not work is done in the light of your understanding of the term ‘work’.
A donkey is carrying a load on its back.
